My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Agreements for On-Call Programmable Logic Controller Programming and Consulting Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 22 - Agreements for On-Call Programmable Logic Controller Programming and Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 10:46:16 AM
Creation date
9/10/2025 8:35:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLC Programming and Consulting Services RFP Response x ENTERPRISE <br />EA Project Number: EA25CSAl60, 0.0.0 AUTOMATION <br />A TETRA TECH COMPANY <br />2.4 Project Team <br />EA's project methodology relies heavily on a structured and intentional staffing model. EA will <br />assign an Account Manager, Project Technical Lead, and a Project Manager to this contract. <br />Additionally, EA will assign additional resources on an as -needed basis depending on the current <br />project or support need. <br />Below is a table listing the personnel that would be assigned to the City's projects as required and <br />their percentage availability for work associated with this contract. EA will contact the City for <br />approval of any staff augmentations. EA has 40 full-time degreed engineers to choose from to <br />support this project team. Many of our project engineers, including the Architect and Project <br />Technical Lead, have been supporting the City's projects for years, gaining valuable knowledge <br />and experience with the City's assets. <br />Garrett, the Project Manager, will be the City's primary point of contact throughout the life of this <br />contract. Detailed resumes are provided in Appendix A Resumes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.