Well 40 Programming and Consulting Services Scope of Work ENTERPRISE <br />EA Project Number: EA25CSAI 60, 0.0.0 AUTOMATION <br />A TETRA TECH COM-Y <br />4.8 Loop Drawings <br />EA will develop loop drawings for Well 40. The intent of developing these is to visualize the <br />different loop components within the control system (i.e. show how each of the input, output, and <br />feedback mechanisms interact within the control system). EA has budgeted around the industry <br />best practice of developing a loop drawing for each individual 10 point within Well 40's control <br />system. <br />EA will submit the loop drawings to the City for review and feedback. <br />Loop Drawings Deliverables <br />Loop Drawings <br />None <br />4.9 Factory Acceptance Testing <br />Enterprise Automation will host a Factory Acceptance Test (FAT) with the City at EA's office. The <br />FAT will provide the City with an opportunity to review EA's testing process and get some hands- <br />on experience with the final product before it is deployed in the field. FAT is typically a subset of <br />the internal testing process. EA will ask the City to identify which test procedures they would like <br />to complete during FAT. <br />EA will require that the City sign off on the FAT before deployment can begin. <br />Factory Acceptance Testing Deliverables <br />Completed and signed FAT documentation <br />None <br />4.10Site Acceptance Testing <br />While onsite during commissioning, EA will perform Site Acceptance Testing (SAT) procedures. <br />The purpose of these tests is to ensure the site programs are all working as expected to gain final <br />project acceptance (client sign -off). <br />EA will require that the City sign off on the SAT before completing deployment. <br />Site Acceptance Testing Deliverables <br />Completed and signed SAT documentation <br />