Laserfiche WebLink
x ENTERPRISE <br />AUTOMATION <br />ATETRATECH COMPANY <br />Kyle Pickrel I, P.E. <br />Engineering Supervisor, 8+ years of experience <br />Professional Summary <br />Kyle is an expert in HMI and PLC configuration and has technical knowledge <br />and extensive experience with PLC/SCADA design and standards, panel <br />design, networking, programming, installation, and commissioning of a <br />variety of systems including AVEVA Plant SCADA, VTScada, Wonderware <br />InTouch, AVEVA System Platform, Think & Do, CRISP, Modicon/Schneider <br />PLCs, and Magelis/Schneider OITs. He is diligent in his approach to <br />engineering challenges and attacks every new project with ingenuity. <br />Formal Education <br />Bachelor of Science, Mechanical Engineering Cal Poly Pomona, 2016 <br />Professional Certifications <br />• Professional Engineer, Control System Engineering, CS 7661 State of California, 2022 <br />Formal Training <br />• VTScada Advanced Configuration and Scripting Trihedral, 2017 <br />Significant Projects <br />Sweetwater Authority: Desalination Plant Upgrade <br />Kyle played key role on the expansion project for a desalination plant. He completed various project tasks <br />during an ongoing one-year assignment for this project, including configuration, testing, and verification of <br />dozens of SCADA screens. He also conducted an investigation and testing of communications between <br />third party power meters, Citect, and Modicon PLCs. In addition, Kyle was involved with the testing of SCADA <br />software. This was the largest project the company had to date, and Kyle helped overcome the challenges <br />involving the project's size and duration. <br />During a six -week commissioning and deployment period at Sweetwater Authority's desalination plant, Kyle <br />was in charge of the investigation and testing of numerous field devices, the investigation and testing of <br />communications between Modicon PLCs and field devices, and equipment PID tuning. Because he was <br />working with and around several subcontractors hired by the Authority during commissioning, several <br />unique challenges presented themselves, especially in coordination. Kyle solved this problem by requiring <br />that deployment plans and checklists be developed far in advance and thoroughly reviewed with all parties <br />involved. <br />Sweetwater Authority: Distribution System PLC Upgrade <br />Kyle programmed 41 Schneider Electric PLC programs to replace outdated hardware at the Authority's <br />various distribution sites. Programming such a large volume of programs provided a challenge of planning <br />and testing communications between programs prior to commissioning. However, Kyle created an intricate <br />test platform and procedure to facilitate communications between the PLCs and a SCADA system to test <br />all logic and ensure it worked properly. <br />ENTERPRISE AUTOMATION • 9050 IRVINE CENTER DRIVE 0 IRVINE, CA 0 92618 PHONE (949) 769-6000 0 WWW.EAINTEGRATOR.COM <br />