Laserfiche WebLink
x ENTERPRISE <br />AUTOMATION <br />ATETRATECH COMPANY <br />Wonderware Historian, automated reports, and automatic alarm dialing. Zack led the commissioning of the <br />system and supported plant operations staff during startup. <br />Sweetwater Authority: Desalination Facility Expansion <br />Served as Engineer on a project to overhaul the SCADA and control systems during the expansion of a 10- <br />million gallon per day reverse osmosis desalination facility. Responsibilities included developing the <br />functional specification (detailed control narrative) for the facility and programming of the Schneider Electric <br />Quantum and M340 Unity -based PLC programs, onsite commissioning, testing, and training. <br />City of Santa Ana: Pump Station Control System Replacement <br />Zack was chosen to be the Engineer on a project to revamp the control system of 20 MGD pump station <br />within the City's potable water distribution system. His responsibilities included reviewing and revising the <br />functional descriptions for the pump station and other ancillary sites, specification and design of the facility's <br />Schneider Electric Magelis HMIs, programming of the Schneider Electric M340 Unity -based PLC programs, <br />and onsite commissioning and testing. He managed the breadth of his responsibilities well, and the project <br />was a success. <br />Water Replenishment District: Ground Water Improvement Project (GRIP) <br />Zack served as consulting Engineer forthe control system during the design -construction phase of the GRIP <br />facility, an Advanced Water Treatment Facility (AWTF) designed to treated approximately 10,000 acre feet <br />of tertiary water annually. He provided consulting services and reviewed the control panel & control <br />networking implementation, PLC code, SCADA screens, alarm dialing, and reporting. He also maintained <br />WRD's SCADA control system standard library and managed standard change requests related to <br />SCADA/PLC. <br />Encina Wastewater Authority: Wastewater Facility SCADA Replacement Design <br />On a project to replace the SCADA and controls system of a wastewater facility serving over 400,000 <br />residents, Zack was the Engineer. He was responsible for the investigation of the existing control system <br />and for identifying areas for networking and control systems improvements and the designing, <br />documenting, programming, and testing of SCADA and PLC standards. <br />Sweetwater Authority: Storage Tank Fill Control Reprogramming <br />Zack served as the Engineer on a project to revise the control strategy used to automate the filling cycles of <br />a 4-million-gallon water storage tank. Zack was in charge of the modification of the functional specification, <br />the modification of Modicon Momentum and Quantum PLC programs, revisions to the Modbus serial radio <br />communications configuration, the modification of Modicon Magelis OIT programs, the modification of a <br />CitectSCADA HMI, and onsite commissioning and testing. His thoroughness with each task was vital to the <br />successful end of this project. <br />Work Experience <br />• Enterprise Automation, Irvine, CA, Automation Architect Jan. 2023 - Present <br />• Enterprise Automation, Irvine, CA, Controls Engineer II Jun. 2017 — Jan. 2023 <br />• Enterprise Automation, Irvine, CA, Controls Engineer I Jun. 2015 — Oct. 2017 <br />ENTERPRISE AUTOMATION • 9050 IRVINE CENTER DRIVE • IRVINE, CA 0 92618 PHONE (949) 769-6000 0 WWW.EAINTEGRATOR.COM <br />