My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Appropriation Adjustment for the Santa Ana Zoo and 10th and Flower Park Stormwater Capture Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 24 - Appropriation Adjustment for the Santa Ana Zoo and 10th and Flower Park Stormwater Capture Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:29:42 AM
Creation date
9/10/2025 8:37:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
24
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Santa Ana Zoo Stormwater Capture <br />and Diversion Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Park Facility <br />LOCATION MAP <br />N <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project features the installation of subsurface stormwater <br />infiltration systems at the Santa Ana Zoo to capture and infiltrate <br />approximately 67 acre-feet per year of stormwater and dry -weather <br />runoff. The project will also include a new urban green space, <br />bioswales, pervious pavement, seating, drought -tolerant <br />landscaping and shade trees, and interpretive signage. <br />F <br />T NEED: <br />infiltration provides multiple benefits, including improving <br />, enhancing local water supplies, and reducing flooding. <br />will also feature a new urban green space in the zoo <br />which will provide recreational benefits to the surrounding <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 2,500,000 - - - - - - <br />Engineering - <br />Planning - <br />TOTAL 2,500,000 - - - - <br />SOURCE OF FUNDS FY 25/26 FY 26127 FY 27128 FY 28129 FY 29130 FY 30131 FY 31132 <br />MEASURE M2 COMPETITIVE 2,500,000 - - - - - - <br />Prop 1 IRWM Grant - <br />TOTAL 2,500,000 - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Construction Engineering Craig Foster, NPDES Manager 1-July-2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.