Laserfiche WebLink
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Party <br />Monitoring <br />Party <br />Signature/Date <br />of Compliance <br />section 5097.9 as well as Health and Safety <br />Code Section 7050.5 shall be followed. <br />c. Human remains and grave/burial goods shall <br />be treated alike per Public Resources Code <br />section 5097.98(d)(1) and (2). <br />d. Preservation in place (i.e., avoidance) is the <br />preferred manner of treatment for discovered <br />human remains and/or burial goods. <br />e. Any discovery of human remains/burial <br />goods shall be kept confidential to prevent <br />further disturbance. <br />Project- <br />Native American Monitor - Juaneno Band of <br />During ground- <br />Project <br />City of Santa <br />Specific <br />Mission Indians, Acjachemen Nation- Belardes: <br />disturbing <br />Applicant/ <br />Ana Planning <br />MM TCR-4 <br />a. The Project applicant shall retain a Native <br />activities <br />Construction <br />Division <br />American Monitor from or approved by the <br />Contractor <br />Juaneno Band of Mission Indians, <br />Acjachemen Nation- Belardes. The monitor <br />shall be retained prior to the <br />commencement of any ground -disturbing <br />activity for the subject project at all project <br />locations (i.e., both on -site and any off -site <br />locations that are included in the project <br />description/ definition and/or required in <br />connection with the project, such as public <br />improvement work). "Ground -disturbing <br />activity" shall include, but is not limited to, <br />demolition, pavement removal, potholing, <br />auguring, grubbing, tree removal, boring, <br />grading, excavation, drilling, and trenching. <br />b. A copy of the executed monitoring <br />agreement shall be submitted to the (City) <br />prior to the commencement of any ground - <br />disturbing activity, or the issuance of any <br />permit necessary to commence ground <br />disturbing activity. <br />City of Santa Ana <br />August 2025 <br />4-24 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />