My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Village Santa Ana Specific Plan Entitlements and Development Agreement (1561 W. <br />Sunflower Avenue) <br />September 16, 2025 <br />Page 26 <br />impacts were identified, included Project specific mitigation measures. In addition, where <br />impacts could not be mitigated to below a less than significant level, the SEIR made new <br />significant and unavoidable findings. The Project's SEIR also provides information <br />regarding short-term, long-term, direct, indirect, and cumulative environmental effects of <br />the Project. It identifies feasible mitigation measures and alternatives that would minimize <br />or eliminate the potentially significant impacts associated with implementation of the <br />Project. <br />SEIR's Notice of Preparation <br />On November 3, 2023, the City sent to the Office of Land Use and Climate Innovation <br />(LCI) and each responsible trustee agency a Notice of Preparation (NOP), stating that a <br />SEIR would be prepared for the Project. A total of nine comments were received during <br />the 30-day NOP review period which began on November 3, 2023, and ended on <br />December 3, 2023. <br />SEIR Scoping Meeting <br />Pursuant to PRC Section 21083.9 and CEQA Guidelines sections 15082(c)(1) and 15083, <br />the City hosted a public scoping meeting on November 15, 2023, to solicit comments on <br />the scope of the environmental review of the proposed Project. Approximately 15 <br />residents attended the meeting and raised concerns about traffic, pedestrian safety, and <br />construction noise and debris. These issues were addressed in the Draft SEIR. In <br />addition, participants were encouraged to submit comments on paper or via email to <br />ensure inclusion in the draft SEIR and environmental analyses. <br />Draft and Final SEIR Public Review and Availability <br />The City determined at the onset of review and preparation based on analyses, the GPU <br />Final PEIR, existing site conditions, setting, and responses to the NOP, that the Project <br />would have no impact or a less than significant impact on the following environmental <br />topic areas and that no further, detailed analysis of these topics was required in the SEIR: <br />Aesthetics, Agriculture and Forestry Resources, Biological Resources, Mineral <br />Resources, and Wildfire. In particular, with respect to aesthetics, PRC Section 21099 <br />provides that "aesthetic and parking impacts of a residential, mixed -use residential, or <br />employment center project on an infill site within a transit priority area shall not be <br />considered significant impacts on the environment." Here, the proposed Project is located <br />in a Transit Priority Area and therefore the SEIR did not include a detailed analysis of <br />aesthetics. However, a discussion on the topic is included in the Land Use and Planning <br />section of the SEIR. <br />For each topical area of potential significance, the SEIR evaluates impacts of the Project, <br />what was evaluated by the GPU Final PEIR, mitigation measures already in place and <br />adopted by the GPU Final PEIR's MMRP, and project -specific mitigation measures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.