Laserfiche WebLink
1 INTRODUCTION <br />The Supplemental EIR for the Project is composed of the following elements: <br />• The Village Santa Ana Specific Plan Project Draft Supplemental EIR and Technical <br />Appendices (April 2025); <br />• The Village Santa Ana Specific Plan Project Final Supplemental EIR (August 2025); and <br />• Santa Ana General Plan Update Program Environmental Impact Report (GPU PEIR), <br />SCH No. 2020029087. <br />1.2 DOCUMENT FORMAT <br />The Findings of Fact is organized into the following sections <br />Chapter 1: Introduction outlines the organization of this document and identifies the location <br />and custodian of the record of proceedings. <br />Chapter 2: Project Summary provides a summary of the Project, overview of the discretionary <br />actions required for approval of the Project, and a statement of the Project's objectives. <br />Chapter 3: Environmental Review and Public Participation Process provides a summary of <br />previous environmental reviews related to the Project area that took place prior to the <br />environmental review done specifically for the Project, and a summary of public participation in <br />the environmental review for the Project. <br />Chapter 4: No Environmental Effects and Less Than Significant Environmental Effects <br />without Mitigation Measure presents a summary of those environmental issue areas where no <br />impacts or less than significant impacts would occur and a corresponding finding adopting the <br />Initial Study and PEIR's conclusions of no impact or less than significant impacts. <br />Chapter 5: Less Than Significant Environmental Effects with Mitigation Incorporated <br />presents a summary of potentially significant environmental effects for which implementation of <br />identified feasible mitigation measures would avoid or substantially reduce the environmental <br />effects to less -than -significant levels and provides a corresponding finding for each effect. In order <br />to ensure compliance and implementation, all of these measures are included in the Mitigation <br />Monitoring and Reporting Program (MMRP) for the Project and adopted as conditions of the <br />Project by the Lead Agency. <br />Chapter 6: Significant and Unavoidable Environmental Effects presents a summary of <br />significant and unavoidable effects for which there are no known feasible mitigation measures <br />that would avoid or substantially reduce the environmental effects to less -than -significant levels <br />and provides a corresponding finding for each effect. <br />Chapter 7: Findings Regarding Significant Irreversible Environmental Changes presents a <br />summary of the significant irreversible environmental changes that would occur should the Project <br />be implemented. <br />Chapter 8: Findings Regarding Growth -Inducing Impacts presents a summary of the growth - <br />inducing effects considered for the Project. <br />Chapter 9: Findings Regarding Project Alternatives presents a summary of the alternatives <br />considered for the proposed Project. <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />iWA <br />