My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 3 <br />ENVIRONMENTAL REVIEW AND PUBLIC <br />PARTICIPATION <br />In conformance with CEQA and the State CEQA Guidelines, the City of Santa Ana conducted an <br />extensive environmental review of the Project, which included a Draft Supplemental EIR and a <br />Final Supplemental EIR, including technical reports, along with a public review and comment <br />period. The following is a summary of the City's environmental review of this project: <br />The City of Santa Ana concluded that a Supplemental EIR should be prepared, and the <br />Notice of Preparation (NOP) was released for a 30-day public review period from <br />November 3, 2023 through December 4, 2023 pursuant to State CEQA Guidelines 15082. <br />The NOP was posted at the Orange County Clerk's Office on November 3, 2023. The <br />notice was published in the Orange County Register, available at the City of Santa Ana, <br />Planning Division Counter, located at 20 Civic Center Plaza, M-20, Santa Ana, CA 92701, <br />and the City of Santa Ana Public Library, located at 26 Civic Center Plaza, Santa Ana, CA <br />92701. Under CEQA, a Lead Agency may proceed directly with preparation of the EIR <br />without preparation of an Initial Study if it is clear that an EIR will be required (State CEQA <br />Guidelines Section 15060[d]). <br />• The NOP public review period ran for 30 days. The City received response letters from <br />the State, regional and local public agencies, and interested parties. These comment <br />letters were included in Appendix A: Notice of Preparation and Scoping Comments of the <br />Draft Supplemental EIR. <br />A duly -noticed scoping meeting for the Supplemental EIR was held on November 15, <br />2023, at 6:00 p.m. at the McFadden Institute of Technology located at 2701 South Raitt <br />Street in the City of Santa Ana to obtain information from the public as to issues that should <br />be addressed in the Supplemental EIR. The notice of a public scoping meeting was <br />included in the NOP distributed on November 3, 2023 and was published in the Orange <br />County Register and was sent to agencies, interested parties, and individuals who <br />requested to be notified of the Project. <br />The Draft Supplemental EIR was distributed by the City of Santa Ana, which was made <br />available for a 52-day public review period (April 17, 2025 through June 9, 2025). The <br />Notice of Availability (NOA) for the Draft Supplemental EIR was sent to all persons, <br />agencies and organizations on the interest list interested persons, published on April 17, <br />2025, at the Orange County Register, and posted at the Orange County Clerk's Office and <br />the State Clearinghouse (SCH) at the Governor's Office of Land Use and Climate <br />Innovation (LCI) on April 17, 2025. Copies of the Draft Supplemental EIR were made <br />available for public review at the City of Santa Ana, Planning Division Counter, located at <br />20 Civic Center Plaza, M-20, Santa Ana, CA 92701, and the Southwest Senior Center, <br />located at 2201 West McFadden Avenue, Santa Ana, CA 92704. The Draft Supplemental <br />EIR was also available for review and download via the following City website location and <br />CEQAnet web portal: https://www.santa-ana.org/the-village-santa-ana-specific-plan/ and <br />https://ceganet.opr.ca.gov/. Additionally, the NOA was published in the Orange County <br />Register. <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.