My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025 Regular
>
Agenda Packet_2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 11:43:20 AM
Creation date
9/10/2025 11:29:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 | Page <br /> <br />ICE Company: <br />ICS has been working with a local company that produces and bags ICE for resale throughout the state of <br />California for over 10 years. ICS provides 24 hour remote and onsite service for both the Milpitas and <br />Modesto plant. <br />Modesto PLC Plant Upgrade Project 1(2022) <br />Replace Main Freezer and ICE packaging lines GE 9030 PLC and IO and 3 remote IO drops located in roof <br />mount ICE makers. Back up GE PLC program and translate to Allen Bradley Studio 5000 <br />software. Existing HMI was replaced with Aveva System Platform SCADA system. The SCADA PC was <br />loaded with PLC and HMI programming software that allowed ICS to remote access to assist with trouble <br />shooting and make additional changes. Field work included remove old PLC from existing control panels, <br />re-wiring, replace wire labels, and install ferrules. Install new Allen Bradley 1769-L33ER PLC and 12 IO <br />cards into existing control main panel located in freezer. Additional circuit protection, and relays and <br />Power Supplies were added as needed. At the same time, we removed 3 Remote IO drops located in <br />roof mount control panels. The replacement of all main PLC and 2-3 remote IO drops were completed <br />onsite during a 3-day shutdown. We did the IO check out on the 3rd day. This was followed by 3 days of <br />commissioning and startup. <br />Modesto PLC Plant Upgrade Project 2(2023) <br />Replace PLC ICE maker 3 Automation Direct (GE -Series 1) PLC in place. Replace Automation Direct <br />program and translate to Allen Bradley Studio 5000 software to be added as 4th RIO drop to recently <br />upgrade Allen Bradley 1769-L33ER PLC. Integrate into existing Aveva System Platform SCADA <br />system. Remove old PLC wiring, replace wire labels, and install ferrules. Install new Allen Bradley Flex IO <br />Ethernet adapter and IO cards into existing roof mount ice maker control panel. Additional circuit <br />protection, and relays and Power Supplies were added as needed. The replacement of the 4th ICE <br />Maker control panel remote IO was completed onsite during a 1-day shutdown. We completed the IO <br />check out the same day. This was followed by 1 days of commissioning and startup. <br /> <br /> <br /> <br />City Council 22 – 117 9/16/2025
The URL can be used to link to this page
Your browser does not support the video tag.