Laserfiche WebLink
Wire assembly requirements. Review AutoCAD schematics to determine, wire gauge <br />and ferrules to be utilized during wire assembly. Measure length of distance to and from <br />components to determine wire fabrication. Assemble all ground wires first, following AC <br />wires and then DC wires. Strip wires to crimp ferrules and label each wire according to <br />panel schematics using tube printer. Land each wire onto components using designated <br />tools. All labels face up. Create wire assemblies for all control panels. Maintain a clean <br />work area. <br /> <br /> <br />Hands On/Work Experience: <br /> <br /> Troubleshooting, diagnosing, and repairing electronics <br /> Identifying electrical components and their schematic symbols <br /> Determining voltage, current, resistance and power by calculations and <br />measurements <br /> Operating test equipment: digital multi-meters, oscilloscopes, and AC power <br />generators <br /> Soldering surface mount components <br /> DC-AC Electronics <br /> PCB Design <br /> Electronic Communications <br /> Programmable Logic Controllers (PLC) <br /> Motors <br /> Reading and understanding specifications and schematics <br /> Design UL508A Control Panels <br /> Estimate UL508A Control Panels <br /> Estimate projects <br /> Field experience in trouble shooting and installation <br /> <br />Education: <br /> Marshall University, West VA Mechanical Engineering Courses <br /> Modesto Junior College Industrial Wiring Courses <br /> University of the Pacific, CA BS in Electrical Engineering <br /> <br /> <br />  <br />  <br />City Council 22 – 131 9/16/2025