My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025 Regular
>
Agenda Packet_2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 11:43:20 AM
Creation date
9/10/2025 11:29:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana IFB No. 25-075 Page 4 of 25 <br />SCOPE OF WORK <br />%SPECIFICATIONS <br />The requested scope of the Contractor includes, but is not limited to the following: <br />x Remove 750KVA XFMR <br />x Remove 3 runs of 700 from XFMR to old 2000 Amp Panel <br />x Install PME 5 on new 4’x6’ structure <br />x Set new 150KVA XFMR on new 10’x12’ structure 5422446 <br />x Procure SCE structure directly from Manufacture according to Design Plan <br />([KLELW, <br />x Install all new ducts and structures <br />x Backfeeding the Corporate Yard Electrical Circuit to Ensure Continuous Power to <br />All Buildings <br />All electrical equipment removed shall be disposed to facilities that are permitted to <br />receive electrical waste and satisfy EPA and local waste regulations. <br />The Contractor will be required to coordinate with SCE and shall accommodate for the <br />following work to be completed by SCE: <br />x Remove #2 primary from 87115E to P5422446 <br />x Pull new 1/0 primary from PME5 to new 1500KVA XFMR <br />x Pull 6 runs of 700 to new 4000Amp panel <br />x EMS to pre-set meter and CT’s <br />All material, equipment and construction should adhere to SCE Design Drawing <br />1724689_0.01. <br />Vendor shall coordinate with SCE all the required installation/upgrades of SCE facilities <br />including new cables, setting of new equipment (switch, transformer, etc.), removal of <br />old transformer, old cable upstream of the panel, removal/installation of SCE meters. <br />C. DELIVERY REQUIREMENTS AND LOCATION(S) <br />Contractor shall identify and prioritize long lead items including but not limited to 4000- <br />amp switchgear and shall coordinate delivery to project location in a timeframe that <br />minimizes downtime. <br />All materials to be delivered to corporate yard to be coordinated with city staff for location <br />of deliveries. All items to be delivered during city corporate yard hours of operation. <br />City Yard <br />215 S. Center St. <br />Santa Ana, CA 92703 <br />Monday-Thursday 7AM-5PM <br />Friday 7AM-4PM <br /> <br /> <br />City Council 20 – 18 9/16/2025
The URL can be used to link to this page
Your browser does not support the video tag.