My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025 Regular
>
Agenda Packet_2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 11:43:20 AM
Creation date
9/10/2025 11:29:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Quality Assurance Program 2020 <br />Page 6 <br />2. DLAE notifies the City of the status of the above mentioned request and gives the City <br />the EA (Expenditure Authorization) number and the estimated costs, if the City's request <br />is accepted. <br />3. The City sends in the "Request for Authorization to Proceed with Construction," "Local <br />Program Agreement Checklist" and "Finance Letter" to DLAE. <br />4. The City shall pay advance deposit to cover the estimated costs of the <br />source inspection. <br />5. EA number will be shown on the bill. <br />6. Upon receiving them, the City shall execute the Program Supplement (PS) agreement and <br />(LPA). <br />7. After award of the construction contract, the Resident Engineer is to complete the top <br />portion of Form CEM-3101, Notice of Materials to be Used, and have the contractor <br />complete the bottom portion of the form. The Resident Engineer shall send a cover memo <br />(Exhibit 16-W), the Form CEM-3101, and one set of PS&E to Caltrans' District Materials <br />Engineer. <br />VIII. REPORTING TEST RESULTS TO RESIDENT ENGINEER <br /> When aggregate is sampled in the material source, results of sand equivalent, cleanness value <br />and sieve analysis should be submitted within 24 hours. When soils and aggregate are <br />sampled at the job site, results of these tests should be submitted within 72 hours. <br /> Compaction and density tests taken at the job site should be submitted within 24 hours. <br /> When soils and asphalt concrete are sampled at the job site, R value and asphalt extraction <br />should be submitted in 96 hours. <br />IX. INDEPENDENT ASSURANCE PROGRAM <br /> The Independent Assurance Program (IAP) includes, but is not limited to: <br />a. Verifying the equipment used for acceptance testing is properly calibrated and in <br />good working condition. Records of equipment calibrations should be kept with the <br />equipment. <br />b. Witnessing sampling and testing by the acceptance tester. <br />c. Performing corroboration testing by the acceptance tester and impendent assurance <br />personnel. <br />d. A written procedure for dispute resolution. <br /> IAP services shall be provided by Caltrans. <br /> <br /> <br />City Council 21 – 31 9/16/2025
The URL can be used to link to this page
Your browser does not support the video tag.