My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025 Regular
>
Agenda Packet_2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 11:43:20 AM
Creation date
9/10/2025 11:29:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 25 Quality Assurance Plan 2019 <br />REPORTING ACCEPTANCE TESTING RESULTS <br />The following are the schedules for reporting material test results to the Resident Engineer: <br />When the aggregate is sampled at material plants, test results for Sieve Analysis, Sand <br />Equivalent and Cleanness Value should be submitted to the Resident Engineer within two <br />(2) working days1 after sampling. <br />When materials are sampled at the job site, test results for compaction and maximum density <br />should be submitted to the Resident Engineer within one (1) working day after sampling. <br />When soils and aggregates are sampled at the job site: <br />1. Test results for Sieve Analysis, Sand Equivalent and Cleanness Value should be <br />submitted to the Resident Engineer within three (3) working days after sampling. <br />2.Test results for R Value and asphalt concrete extraction should be submitted to the <br />Resident Engineer within four (4) working days after sampling. <br />When sampling products such as portland cement concrete (PCC), cement-treated base (CTB), hot <br />mix asphalt (HMA), and other such materials, the time of sampling shall be varied as much as <br />possible in order to avoid a predictable sampling routine. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 For aggregate containing asphalt, test results will be submitted to the Resident Engineer within <br />three (3) working days <br /> <br /> <br />City Council 21 – 71 9/16/2025
The URL can be used to link to this page
Your browser does not support the video tag.