My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HCI SYSTEMS, INC. (2)
Clerk
>
Contracts / Agreements
>
H
>
HCI SYSTEMS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 3:03:37 PM
Creation date
9/10/2025 3:03:01 PM
Metadata
Fields
Template:
Contracts
Company Name
HCI SYSTEMS, INC.
Contract #
A-2025-140-03
Agency
Public Works
Council Approval Date
8/19/2025
Expiration Date
8/31/2028
Insurance Exp Date
3/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:88AA74OA-D311-464C-87AC-45D747CFOCDA <br /> SCOPE OF WORK <br /> • Ensure that cabinet is free from exterior obstructions (maintain 36" access) <br /> • Inspect cabinet glazing for damage <br /> Annual Inspection and Testing of Fire Protection Systems <br /> Annual inspection and testing to include all Quarterly requirements. <br /> 1. Wet Sprinkler Systems and Standpipes <br /> 2. Water Flow Alarm Devices <br /> • Verify water flow devices are free of physical damage <br /> • Testing shall be accomplished by opening the inspector's test valve <br /> • Alarms must report to the fire panel within 90 seconds of flow <br /> • Test in accordance with the manufacturer's instructions <br /> • Note: Water flow devices include Water Motor Gongs, Pressure Switch, and <br /> Vane type <br /> 3. Main Drain at Each Riser <br /> • Test main drain <br /> • Record initial static pressure <br /> • Record residual pressure <br /> • Record restored static pressure <br /> 4. Control Valve — Position and Operation <br /> • Each valve shall be operated through its full range of motion <br /> • Test that all tamper switches must report to the fire panel <br /> • Verify that the signal does not restore at any valve position except the open <br /> position <br /> • PIVs shall be opened until spring or torsion is felt on the rod, indicating that <br /> the rod has not become detached from the valve <br /> • PIVs and OS&Ys shall be backed one-quarter turn from the fully open <br /> position to prevent jamming <br /> 5. Sprinklers <br /> • Inspect all exposed sprinklers for paint, corrosion, and leaking <br /> • Inspect all sprinklers for flow obstructions (i.e. light fixtures, exit signs, <br /> storage— 18" from ceiling) <br /> • Inspect all sprinklers for the proper spacing and location per NFPA 13 <br /> 6. Hangers and Seismic Braces <br /> • Inspect from floor level <br /> • Inspect for looseness and damage <br /> • Concealed hangers and braces do not need to be checked <br /> City of Santa Ana lFB No. 25-047 Page 17 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.