My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2025
>
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:52:20 AM
Creation date
9/25/2025 9:50:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mixed-use development. However, this alternative would not maximize the opportunities to the <br /> same extent as the Project as described in the Project objectives to incorporate a mix of high- <br /> intensity office and residential living with experiential commercial uses as there would be fewer <br /> retail services and no office uses. Although this alternative would still provide new retail services <br /> and associated jobs, the fewer retail services would result in a net decrease of jobs from existing <br /> conditions and would not complement the South Coast Metro area with a diversity of new housing <br /> in a jobs-rich environment as strongly as the Project. (Draft Supplemental EIR, p. 6-21.) <br /> Findings: The City Council rejects Alternative 2: Reduced Project Alternative, on the following <br /> grounds, each of which individually provides sufficient justification for rejection of this alternative: <br /> (1) the alternative fails to meet the basic Project objectives to the same extent as the proposed <br /> Project; and (2) the alternative fails to avoid or reduce the Project's significant and unavoidable <br /> impacts relating to recreation. <br /> 9.2.3 Alternative 3: Reduced Project with No Subterranean Parking Alternative <br /> The Reduced Project with No Subterranean Parking Alternative would reduce residential and <br /> commercial uses and remove office space to minimize operational impacts to volatile organic <br /> compounds associated with area sources and avoid the construction-related impacts related to <br /> ground disturbance required for subterranean parking(i.e., excavations below 14 bgs).Alternative <br /> 3 would reduce the number of residential units to 1,000 units, the total commercial area to 25,000 <br /> square feet, and the publicly accessible parks/recreation facilities and open space to 6.8 acres. <br /> This alternative would not include the proposed subterranean parking level and associated <br /> excavation activities and would reduce the overall length and magnitude of construction phasing. <br /> Alternative 3 would construct two surface parking lots and a three-level parking garage in addition <br /> to the podium parking levels within the residential buildings. To support Alternative 3, a parking <br /> garage would be added to Block D(located in the northern central portion of the project site), and <br /> surface parking would be added to Blocks F and H (located in the eastern central portion and the <br /> center of the project site, respectively). The total amount of parking stalls would be reduced to <br /> 1,500 stalls, and the total amount of bicycle stalls would be reduced to 96 stalls. (Draft <br /> Supplemental EIR, p. 6-21.) <br /> Environmental Effects: The Reduced Project with No Subterranean Parking Alternative would <br /> result in a reduced magnitude of impacts related to construction activities and resulting area and <br /> depth of ground disturbance. As such, construction impacts related to air quality, cultural <br /> resources, geology and soils, GHG emissions, noise, and tribal cultural resources would be <br /> reduced. However, as with the Project, impacts would still be less than significant or less than <br /> significant with mitigation, but residual impacts would be less when compared to those of <br /> the Project. <br /> During operation, the Reduced Project with No Subterranean Parking Alternative would be <br /> expected to result in reduced emissions of criteria pollutants and GHGs, energy consumption, <br /> vehicle miles traveled, overall population, and demand for public services and utility services.The <br /> Reduced Project with No Subterranean Parking Alternative would provide 6.8 acres of publicly <br /> accessible parks/recreation facilities and open space, resulting in a higher recreation-to-resident <br /> ratio of 2.8 acres per 1,000 residents than the Project. However, significant and unavoidable <br /> impacts to recreation would remain. Although the volume of impacts would be reduced by the <br /> Reduced Project with No Subterranean Parking Alternative in comparison to the Project, the <br /> Reduced Project with No Subterranean Parking Alternative would not eliminate the significant and <br /> unavoidable recreation impacts or the less than significant impacts of the Project. (Draft <br /> Supplemental EIR, pp. 6-27—6-28.) <br /> Resolution No. 2025-041 <br /> Page 102 of 140 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.