My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2025
>
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:52:20 AM
Creation date
9/25/2025 9:50:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connections at loading docks for plug-in of the anticipated number of refrigerated <br /> trailers to reduce idling time and emissions. <br /> • Applicants for manufacturing and light industrial uses shall consider energy <br /> storage and combined heat and power in appropriate applications to optimize <br /> renewable energy generation systems and avoid peak energy use. <br /> • Site-specific developments with truck delivery and loading areas and truck parking <br /> spaces shall include signage as a reminder to limit idling of vehicles while parked <br /> for loading/unloading in accordance with California Air Resources Board Rule 2845 <br /> (13 CCR Chapter 10 Section 2485). <br /> • Provide changing/shower facilities as specified in Section A5.106.4.3 of the <br /> CALGreen Code (Nonresidential Voluntary Measures). <br /> • Provide bicycle parking facilities per Section A4.106.9 (Residential Voluntary <br /> Measures)of the CALGreen Code and Sec. 41-1307.1 of the Santa Ana Municipal <br /> Code. <br /> • Provide preferential parking spaces for low-emitting, fuel-efficient, and carpool/van <br /> vehicles per Section A5.106.5.1 of the CALGreen Code (Nonresidential Voluntary <br /> Measures), <br /> • Provide facilities to support electric charging stations per Section A5.106.5.3 <br /> (Nonresidential Voluntary Measures) and Section A5.106.8.2 (Residential <br /> Voluntary Measures) of the CALGreen Code. <br /> • Applicant-provided appliances (e.g., dishwashers, refrigerators, clothes washers, <br /> and dryers) shall be Energy Star—certified appliances or appliances of equivalent <br /> energy efficiency. Installation of Energy Star— certified or equivalent appliances <br /> shall be verified by Building & Safety during plan check. <br /> • Applicants for future development projects along existing and planned transit <br /> routes shall coordinate with the City of Santa Ana and Orange County Transit <br /> Authority to ensure that bus pad and shelter improvements are incorporated, as <br /> appropriate. <br /> Refer to Project-Specific MM AQ-1, above. <br /> Explanation of the Rationale: The rationale and facts supporting the above finding are fully <br /> developed in Section 4.1,Air Quality, pages 4.1-31 through 4.1-41 of the Draft Supplemental EIR. <br /> The following presents a summary of that rationale: <br /> The evaluation provided in the Draft Supplemental EIR determined that the Project's construction- <br /> related and operation phase-related air quality impacts would be less than significant, with the <br /> exception of operational VOC emissions during the summer. Regarding the mitigation measures <br /> in the GPU PEIR related to this threshold, the technical assessment and appendices prepared for <br /> the Project satisfy GPU PEIR MM AQ-1 and MM AQ-2, which require preparation of a technical <br /> assessment evaluating a potential project's construction-related and operation phase-related air <br /> quality impacts. The possible mitigation measures to reduce short-term and long-term emissions <br /> Resolution No. 2025-041 <br /> Page 70 of 140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.