My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCADIS U.S., INC. (3)
Clerk
>
Contracts / Agreements
>
A
>
ARCADIS U.S., INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 2:53:05 PM
Creation date
10/3/2025 2:51:07 PM
Metadata
Fields
Template:
Contracts
Company Name
ARCADIS U.S., INC.
Contract #
A-2025-152
Agency
Public Works
Council Approval Date
9/16/2025
Expiration Date
9/15/2028
Insurance Exp Date
6/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> Traffic signals to be synchronized along the corridor are controlled by the individual Agency owners. The <br /> Agencies along the corridor utilize several different types of controller assemblies. Controller Unit types <br /> employed within the assemblies may include various proprietary pre-Advanced Transportation <br /> Controllers (ATC) each having their own respective firmware/operating systems and characteristics; and, <br /> some of the newer ATC which is now a requirement of the Comprehensive Transportation Funding <br /> Program (CTFP) Guidelines. The respective Agencies also interface these controllers utilizing unique <br /> Advanced Transportation Management Systems (ATMS) or Master Central Systems. Per CTFP <br /> Guidelines, all ATMS to be installed or modified must comply with all applicable NTCIP standards for <br /> communications. <br /> SCOPE OF WORK <br /> The City of Santa Ana desires to retain an experienced firm (Design-Build Entity)to implement the Kraemer <br /> Boulevard/ Glassell Street/ Grand Avenue corridor Regional Traffic Signal Synchronization Project, <br /> approved by Orange County Transportation Authority (OCTA) as part of the 2024 Project P corridors from <br /> Renewed Measure M (M2). The City intends to enter into an agreement with the selected Firm for the <br /> services described herein and agreed to by both parties. Although the full scope of work shall be <br /> negotiated in the Design-Build Contract, as described herein, the selected Design-Build Entity will be <br /> expected to fulfill, at a minimum, the services and technical requirements described in the Scope of Work. <br /> The project length is approximately 15.14 miles and includes 61 signalized intersections, starting from <br /> Lambert Road in the City of Brea to Dyer Road in the City of Santa Ana (Attachment A- Project Map and <br /> Intersection List). The participating agencies are the Cities of Brea, Placentia, Anaheim, Orange, Santa <br /> Ana and the California Department of Transportation. Caltrans is a participating agency in the project and <br /> the participating Cities are committed to executing a cooperative agreement with Caltrans for the <br /> implementation of optimized signal timing at the Caltrans intersections. There are no proposed physical <br /> improvements at the Caltrans signals. <br /> The goals of the project are to implement all the required timing and traffic signal improvements identified <br /> in the Improvement List(Scope of Work-Attachment B), to improve traffic flow, reduce stop and minimize <br /> congestion on the Kraemer Boulevard/Glassell Street/Grand Avenue corridor. The scope of work includes <br /> but not limited to the followings: <br /> • Provide project and contract management throughout the project duration. <br /> • Provide timing and operation analysis, develop and implement optimized traffic signal <br /> synchronization timing for the corridor. <br /> • Provide engineering services to prepare plans, specifications and estimates for traffic signal <br /> equipment and related infrastructure improvements. <br /> • Upon approval by the owning Agencies and City of Santa Ana, procure, furnish and install all <br /> approved infrastructure improvements for project. <br /> • Provide construction management services to oversee the improvement implementations of the <br /> project. <br /> • Provide ongoing signal timing and maintenance support for 2-year after initial implementation of <br /> the timing. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.