My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE NO. 8 <br />Drawing Submittal Requirements <br /> Upon request by the Fog Control Program Manager or his designee: <br />1. A proposed or existing FSE may be required to submit facility site plans, mechanical <br />and plumbing plans, and other details to show the sewer locations and connections <br />for its facility or premises. The submittal shall be in a form and content acceptable <br />to the City for review of an existing or proposed grease interceptor, grease trap, <br />monitoring facilities, metering facilities, and operating procedures. The review of the <br />plans and procedures shall in no way relieve a FSE of the responsibility of modifying <br />the facilities or procedures in the future, as necessary to meet the requirements of <br />Section 39-56, the FOG Control Program or any requirements of other Regulatory <br />Agencies. <br />2. The City may require drawings to be prepared by a California Registered Civil, <br />Mechanical, or Electrical Engineer. <br />12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.