Laserfiche WebLink
<br />3¤¢³¨®­ ΗȀ 3¸²³¤¬ %µ «´ ³¨®­Ǿ # ¯ ¢¨³¸ !²²´± ­¢¤ <br /> ­£ # ¯¨³ « )¬¯±®µ¤¬¤­³² <br />#¨³¸ ®¥ 3 ­³  !­  <br /> <br /> <br />allocated for maintenance, rehabilitation and repair and replacement of sanitary sewer facilities, as well as <br />emergency response to sewer blockage issues. The Sewer Connection Fee fund is allocated solely for the <br />construction of sewer capacity enhancements. The City balances the rehabilitation projects on a year-to-year <br />basis and aims to improve the operating efficiency and life expectancy of the entire sewer system. Sewer service <br />rates are periodically reviewed and adjusted to address identified CIP needs. <br /> <br />8.3.2 Supporting Documents <br />The following documents, attached as appendices, support the System Evaluation and Capacity Assurance <br />Plan, thereby allowing the City to comply with the System Evaluation and Capacity Assurance Plan requirements <br />of the WDR: <br /> <br /> The City of Santa Ana Standard Plans for Sanitary Sewers, Public Works Agency, Appendix F. <br /> <br /> Division. Due to the size of these documents, they have not <br />been attached as appendices. <br /> <br /> City of Santa Ana Sewer Master Plan Final Report, December 2016 <br /> <br />ΗȃΑ <br />2025 <br /> <br />