Laserfiche WebLink
SPILL CATEGORY DETERMINATION DIAGRAM <br />NOTIFY THE SUPERVISOR <br />Upon receiving a call after normal working hours to respond to any sewer spill, the <br />designated primary on -call employee shall immediately contact the on -call water <br />resources maintenance supervisor and inform him of the sewer spill event. The primary <br />on -call employee shall then call the rest of the on -call crew and they shall report directly <br />to the City Yard. They shall retrieve a vacuum truck and a bobtail truck with appropriate <br />sewer spill response equipment to the sewer spill location. <br />The intent is to reduce the response time required to move the necessary equipment and <br />manpower to the sewer spill location and to minimize the sewer spill time. It is mandatory <br />for the on -call water resources maintenance supervisor to attend the sewer spill site and <br />take over the spill response operation upon his arrival. <br />During normal working hours all phone calls and coordination will be handled by a Public <br />Works Agency (PWA) - Water Resources Maintenance Supervisor. <br />REVISION 2.0 (4/23) <br />