My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. If the spill reached a City storm drain, contact the City's NPDES Manager (Craig <br />Foster) at (714) 397-0759. The spill must be documented as part of NPDES <br />Permit requirements. The NPDES Manager may also be able to assist with spill <br />response and contractor cleanup. <br />3. Category 3 spills must be reported and certified through the California <br />Integrated Water Quality System (CIWQS) within 30 days after the end of the <br />calendar month in which the spill occurred. <br />4. Category 3 sewer spill certification will be performed by the City's Legally <br />Responsible Officer (LRO). <br />CATEGORY 4 SPILL REPORTING: <br />Category 4 spills are: <br />• Less than 50 gallons which: <br />o Does not reach a surface water. <br />o Enters a drainage conveyance system but is fully recovered and returned to <br />the sanitary sewer system. <br />Reporting <br />Reporting for all Category 4 spills shall be made by the on -call duty employee, water <br />maintenance supervisor, and or water maintenance crew leader and shall be handled as <br />follows: <br />1. Call the Environmental Health Division of the Orange County Health Care <br />Agency (OCHCA). During working hours, call OCHCA directly at (714) 433- <br />6419. After working hours and on the weekends, notify OCHCA by calling <br />Orange County Control One (available 24 hours) at (714) 628-7008. <br />2. If the spill reached a City storm drain, contact the City's NPDES Manager (Craig <br />Foster) at (714) 397-0759. The spill must be documented as part of NPDES <br />Permit requirements. The NPDES Manager may also be able to assist with spill <br />response and contractor cleanup. <br />3. Category 4 spill volume and number estimate must be reported and certified <br />monthly through the California Integrated Water Quality System (CIWQS) <br />within 30 days after the end of the calendar month in which the spill occurred. <br />4. Category 4 spills must be reported and certified through the California <br />Integrated Water Quality System (CIWQS) by February 1st after the end of the <br />calendar year in which the spill occurred. <br />5. Category 4 sewer spill certification will be performed by the City's Legally <br />Responsible Officer (LRO). <br />REVISION 2.0 (4/23) 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.