Laserfiche WebLink
y of Santa Ana Section 7: Sewer Pipe Blockage Control <br />7) The City has developed and implemented source control measures for all sources of FOG discharged to <br />the sanitary sewer system for each section of the Sewer Line Problem Areas identified by adopting <br />Ordinance No. NS 2921. <br />A major collaborative effort took place in this SSMP requirement during the development of the City's <br />existing SSMP. A FOG Control Program Manual was developed to specify the key elements of the <br />ongoing FOG Control Program and will be further discussed and updated (when necessary) as required <br />in the WDR. <br />A comprehensive FOG source identification investigation process is being implemented and refined as <br />part of the FOG Control Program. The process incorporates CCTV investigation along with FSE <br />inspections to determine the sources of FOG discharges to sewer system EMLs. The source <br />identification process is included in the FOG Control Program Manual. <br />7.1 Supporting Documents <br />The following documents, attached as appendices, support the City's FOG Control Program, thereby assist the <br />City to comply with the FOG Control Program requirements of the Statewide General Waste Discharge <br />Requirements (WDR): <br />• City of Santa Ana Municipal Code, Chapter 39, Appendix D; <br />• Ordinance No. NS-2921, Appendix E; <br />• The City of Santa Ana Standard Plans for Sanitary Sewers, Public Works Agency, Appendix F; <br />• The City of Santa Ana Standard Specifications of Sewer Construction, Public Works Agency, Appendix G; <br />• The City of Santa Ana FOG Control Program Manual, Appendix L; <br />• A Collection of Regulations and Logs which support the FOG Control Program, Appendix M: <br />o FOG Rules and Regulations (English) <br />o FOG Rules and Regulations (Spanish) <br />o FOG Worksite Poster <br />o FSE Employee Training Log <br />o FSE GRE Maintenance Log <br />o FSE Lateral Maintenance Log <br />o FSE Waste Grease Log <br />2025 <br />