Centennial Park, Fields 5 and 6 <br /> Santa Ana, CA <br /> Turnkey Scope of Work <br /> Customer Responsibilities: <br /> 1. Complete access to the site for construction utilizing standard 2-wheel drive rubber tire equipment. <br /> 2. Locate existing underground utilities not covered by your local utilities. (i.e.water lines,electrical lines, irrigation <br /> systems,and sprinkler heads). Musco or Subcontractor will not be responsible for repairs to unmarked utilities. <br /> 3. Shut-off irrigation system at park at least one week prior to start of construction. Irrigation systems to remain off <br /> during construction timeframe, <br /> 4. Closer playing fields to activities from 6AM—SPM, Monday-Friday,during project. <br /> 5. Pay for extra costs associated with foundation design that differs from the preliminary foundation design provided <br /> with this proposal once the geotechnical report has been provided;as well as excavation in non-standard soils <br /> (rock,caliche, high water table,collapsing holes,etc.)or soils not defined in geotechnical report. <br /> 6. Musco will submit plans to the City for plan check,and pull permits once plans are approved. City of Santa Ana to <br /> pay all plan check and permit fees,and any fees associated with special inspections. <br /> 7. Provide laydown area on site for dumpsters,equipment containers,etc. <br /> Musco Responsibilities: <br /> 1. Provide required foundations,poles,electrical enclosures, luminaires,wire harnesses,and control cabinets. <br /> 2. Provide layout of pole locations and aiming diagram. <br /> 3. Provide Project Management as required. <br /> 4. Provide stamped structural calculations and foundation designs based on soil parameters as outlined in the <br /> geotechnical report. Geotechnical services include field observation during hole auguring for foundations. Any <br /> other special inspections required are provided by the City. <br /> 5. Submit electrical and structural plans to the City Building Department for approval. City to pay cost of plan-check. <br /> 6. Assist our installing subcontractor and ensure our responsibilities are satisfied. <br /> Subcontractor Responsibilities <br /> General: <br /> 1. Provide sealed Electrical Plans to include stamped foundation design and structural calculations. <br /> 2. Provide soils report for structural engineering/foundation design,and field observations during hole auguring. <br /> 3. Obtain required construction permits,City to pay cost of permits. <br /> 4. Contact 811 for locating underground public utilities and then confirm they have been clearly marked. <br /> S. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation systems <br /> have been located and are clearly marked to avoid damage from construction equipment. Notify owner and repair <br /> damage to marked utilities. Notify owner and Musco regarding damage which occurred to unmarked utilities. <br /> 6. Provide labor,equipment, and materials to off load equipment at jobsite per scheduled delivery. <br /> 7. Provide storage containers for material, (including electrical components enclosures),as needed. <br /> 8. Provide necessary waste disposal and daily cleanup. <br /> 9. Provide adequate security to protect the jobsite,and Musco delivered products from theft,vandalism,or damage <br /> during the installation. <br /> 10. Keep all heavy equipment off playing fields when possible,provide ground protection as needed to minimize <br /> damage to existing grounds. Repair damage to grounds which exceeds that which would be expected. <br /> Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. <br /> Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring <br /> repair. <br /> �',/�/0'�j/�j��) <br /> �/ 2016,2023 Musco Sports Lighting.LLC•M-2168-enUS-14 <br /> Musco* <br /> 3 of 6 <br />