Laserfiche WebLink
EXHIBIT A <br />Date: 6/2/2024 Estlmatts 9 <br />ARTIST & DESIGNER <br />MARINA AGUILERA <br />AGUILERAARTS@GMAILCOM T. * 1949 890 o983 I RSM, CA, <br />I <br />South Maln Street Art Proaram - Pine Street Parking Lot Art Sculpture <br />Scope at Work <br />ARTWORK LOCATION - Northeast corner of Main Street and Pine Avenue public parking lot <br />adjacent to public sidewalk and landscape area. <br />CLIENT BILL TO: <br />Name <br />Address <br />Email..._ ..... ............. ._.. .. ..._.........._.__._. Phone ..... ... ._ <br />ART1iJORK'DEVELOPMTNT <br />t Concept preparation for art ttstallation of appimdmhrtalg 9 fool high lie sculpture. <br />Concept includes decorative pots and horoscope around sculpture with landscaping <br />elements in decorative pots. <br />z Preparaton of iRe.wraughl Iron artwork painting, and fabrication forsculpture. <br />3. Londso cape design &__p_ottad plmis <br />4. Woman of Grace plaque <br />S.Ultta1L4110/51seco9rdlnntlon ..... .... ... ..... <br />Total Artwork Development Coat - _ ...... ... _...... _.... <br />C65T <br />$7,500.00 <br />! $n,.ri00.00 <br />$3,500.00 <br />$1,000,00 <br />1$4.,000,00, <br />27 .00 - <br />RTWORK CONSTRUCTI.ON.& INSTALLATION' <br />tCorner location site preparation behind landscape curb. Area of preparation Includes a triangular Out off <br />behind curb to parking lot planter. Existing curb and Irrigation bodtflow preventer to be protected In place. <br />Preparation includes m1nor grading for installation of Improvements and relocation of lalgation the and <br />heads in location of work <br />RPreporadon of sculpture foundatim Sculpture tie to be Installed on masonry block base. <br />3,Comor knprovaments Include proporatlon and installation of horoscope concreta and decorative tiles. <br />4.Decoralive pots (two large and two small planters) to be Installed and epoxied to hordscope with In"llo <br />connection for landscape materials. <br />91andscaping to be installed In decorative pots. <br />GTlle sculpture anddecorotive pots to be anti- grafflil cooled, <br />Total Artwork Construction 6 Installation Cost - (U&I General Contract) <br />$22,000.00 <br />(Detailed scope Attached) <br />Overall Artwork Cost <br />$49.500.00 <br />Sub Total <br />Notes <br />Discounts <br />Taxes <br />Cxrand Total <br />._. _$49,500,00'. <br />Terms & Conditions Add your terms and c:arKhUons and other key information We Add your Leong and condfions and other key <br />infarmation hereAddyour terms and conditions and ogler key information here Add your teens and cOndiliorle and other key <br />kfnrtadah here Atld yohtt farms and conditions and otter key information here. <br />THANK YOU! <br />