My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-11-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025 Regular & HA
>
Agenda Packet_2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 12:26:26 PM
Creation date
10/29/2025 12:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/4/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> <br /> <br /> <br /> <br /> <br /> <br />cause for the City to move in on the work site to make corrective work. Such work will be done <br />on a force account basis with an additional callout charge of $75 for each callout. It should <br />also be noted that there is a minimum two-hour charge for labor on any callout. <br />XVI. SAFETY REQUIREMENTS <br />All work performed under this contract shall be performed in a manner as to provide <br />maximum safety to the public and staff where applicable, comply with all safety standards <br />related to personal protective equipment (PPE) required by CAL-OSHA or other applicable <br />Local, State and Federal safety regulatory agencies. <br /> <br />XVII. ENVIRONMENTAL CONDITIONS <br />1. Comply with all applicable local, state, federal regulations and requirements. <br />2. Transport, store, apply, dispose of all bio-waste and hazardous materials as required by law. <br />3. Supply, if necessary, a trash container, for non-hazardous materials only. <br />4. Remove from the work site and properly dispose of all spent materials, hazardous <br />materials, debris, and the like on a daily basis. Do NOT accumulate waste materials <br />unless the Projects Manager otherwise allows. <br />5. Minimize contamination from materials, wastes, spills, or residues at the jobsite to <br />street, drainage facilities, or adjoining property by wind or runoff. <br /> <br />XVIII. TRAFFIC CONTROL <br />All traffic control (if required) shall conform to the requirements of the latest edition of the <br />“Work Area Traffic Control Handbook” (WATCH, City Standard Plan 1125F (SP1125F), the <br />Manual on Uniform Traffic Control Devices (MUTCD), the current MUTCD California <br />Supplement and these Special Provisions. <br />1. The Contractor shall maintain at least one open traffic lane in each direction at all time on <br />all streets. Flagmen shall be required when directed by the City. <br />2. During non-working hours, all lanes shall be opened to traffic. <br /> <br />3. Flashing arrow boards shall be required on arterial streets. Deviation from this <br />requirement will be subject to approval from the Traffic Engineer. <br />4. Traffic control plans must be submitted and approved before starting work on any <br />public street, except for the following temporary closures: <br />a. Temporary single lane closure on 4 or 6-lane arterials may be done per <br />WATCH without submitting a traffic control plan. However, this will require approval <br />from the Traffic Engineer. <br />b. Temporary closure of local streets may be done per WATCH without submitting <br />traffic control plans. However, this will require approval from the Traffic Engineer. <br />XIX. SAFETY PROGRAM REQUIREMENTS <br />Work Site Safety shall be as defined by the Standard Specifications and these special provisions: <br /> <br />City of Santa Ana RFP 25-116 Page 28 of 60 <br /> <br /> <br />City Council 17 – 62 11/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.