My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 2:03:48 PM
Creation date
10/29/2025 1:29:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 25-6033 <br />TRAFFIC SIGNAL MODIFICATION AT SEGERSTROM AVENUE & RAITT STREET AND <br />SEGERSTROM AVENUE & FLOWER STREET <br />PROJECT NO.: 22-6018 <br />PEDESTRIAN HYBRID BEACON INSTALLATION AT EDINGER AVENUE AND <br />TOWNER STREET <br />TOTAL BASE BID- ITEMS 1-23 $ � ,3G-7, 2°1(,.00 <br />ADD ALTERNATE BID <br />24 Install GTT Opticom EVP System at 1 LS $ I $ <br />Segerstrom Avenue and Raiff Street <br />«o,�fo� <br />25 Install GTT Opticom EVP System at 1 LS $ $ <br />Segerstrom Avenue and Flower Street <br />TOTAL ALTERNATE BID —ITEMS 24-25 1 $ 31, 9 $$ <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within One Hundred Twenty (120) working days after the commencement date stated in <br />the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place <br />order for long -lead time items (i.e. Traffic Signal Poles, Electrical Meter Pedestal and Fiber Optic <br />Cable). The absolute maximum time of completion of improvement (including time extensions, <br />weather, and material procurement) shall not exceed 365 calendar days. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $4,200 per calendar day. <br />Name of Firm Elecnor Belco Electric, Inc. <br />Signature of BIDDER <br />Title Executive Vice <br />,John Wong <br />(If an individual, so state. if r co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.