Laserfiche WebLink
City of Santa Ana California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br /> <br />- 12 - <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Mitigation Measure Implementation <br />Party <br />Implementation <br />Phase <br />Monitored <br />By <br />Outside <br />Agency <br />Coordination <br />➢ In the case of nighttime construction, the <br />contractor shall comply with the provisions of <br />the nighttime noise variance issued by the City. <br />➢ Conduct periodic noise measurements in <br />accordance with an approved noise monitoring <br />plan, specifying monitoring locations, <br />equipment, procedures, and schedule of <br />measurements and reporting methods to be <br />used. <br />NOISE- <br />2 <br />All construction activities that employ mechanized <br />stationary equipment that generate noise levels shall <br />comply with the applicable noise standards established <br />by the City of Santa Ana. The equipment shall be <br />designed with noise-attenuating features (e.g., <br />enclosures) and/or located at areas (e.g., belowground) <br />where nearby noise-sensitive land uses would not be <br />exposed to a perceptible noise increase in their noise <br />environment. <br />City of Santa Ana Construction City of Santa <br />Ana N/A <br />NOISE- <br />3 <br />To prevent impacts from vibrations, large vibration <br />producing equipment should be placed as far as is <br />feasible from sensitive receptors. Furthermore, the City <br />of Santa Ana and their designees should implement the <br />following measures as needed: <br /> <br />➢ Pre-construction Survey - A before and after <br />survey should include inspecting building <br />City of Santa Ana Pre-Construction/ <br />Construction <br />City of Santa <br />Ana N/A <br />  <br />  <br />City Council 15 – 120 12/2/2025