Laserfiche WebLink
City of Santa Ana California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br /> <br />- 16 - <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Mitigation Measure Implementation <br />Party <br />Implementation <br />Phase <br />Monitored <br />By <br />Outside <br />Agency <br />Coordination <br />and any off-site locations that are included in <br />the Project description/definition and/or <br />required in connection with the Project, such as <br />public improvement work). “Ground-disturbing <br />activity” shall include, but is not limited to, <br />demolition, pavement removal, potholing, <br />auguring, grubbing, tree removal, boring, <br />grading, excavation, drilling, and trenching. <br /> <br />➢ A copy of the executed monitoring agreement(s) <br />shall be submitted to the lead agency prior to <br />the earlier of the commencement of any <br />ground-disturbing activity, or the issuance of <br />any permit necessary to commence a ground- <br />disturbing activity. <br /> <br />➢ The monitor(s) will complete daily monitoring logs <br />that will provide descriptions of the relevant <br />ground-disturbing activities, the type of <br />construction activities performed, locations of <br />ground-disturbing activities, soil types, cultural- <br />related materials, and any other facts, <br />conditions, materials, or discoveries of <br />significance to the Tribe. Monitor logs will <br />identify and describe any discovered TCRs, <br />including but not limited to, Native American <br />cultural and historical artifacts, remains, places <br />of significance, etc., (collectively, tribal cultural <br />  <br />  <br />City Council 15 – 124 12/2/2025