Laserfiche WebLink
Safe Routes to Parks and Wheelchair Assessment Plan Grant Funds <br />December 2, 2025 <br />Page 2 <br />5 <br />4 <br />4 <br />1 <br />The grant provides up to $651,200, with the City contributing $162,800 in local matching <br />funds, for a total project cost of $814,000. The grant performance period is 42 months <br />from the award date, ending no later than September 30, 2028. <br />Santa Ana is a densely populated, walkable community where many residents rely on <br />active transportation. Approximately 31% of residents are under 18, over 50% of <br />students walk or bike to school, and 55% of households lack access to a car. Despite <br />this, the City has limited pedestrian and bicycle infrastructure. The 2022 Mobility <br />Element Update identified the need for a comprehensive Safe Routes to Parks and <br />Wheelchair Assessment Plan to improve safety and accessibility for all users. <br />The Plan will evaluate streets and neighborhoods surrounding the City’s 48 parks and <br />recreation facilities, prioritizing improvements and programs based on criteria such as <br />safety needs and disadvantaged community status. Community engagement will be a <br />central component, with workshops and walking/biking audits conducted to identify key <br />routes and safety concerns. Participants will include neighborhood associations, local <br />schools, sports leagues, non-profits, the Orange County Health Care Agency, the <br />Orange County Transportation Authority, and various City departments including Parks <br />and Recreation, Traffic Engineering, Police, and Planning. <br />The engagement process will build upon the Santa Ana Vision Zero Plan adopted in <br />April 2024. Community input will be integrated with Vision Zero safety data to identify <br />and document recommended improvements based on proven crash reduction factors. <br />A second project component will include a citywide assessment of wheelchair ramps. <br />This assessment will document locations where ramps are existing, missing, or non- <br />ADA compliant. Results will be incorporated into the City’s GIS and asset management <br />systems to track and prioritize future accessibility improvements. <br />The Vision Zero Plan has identified 20 safety corridors citywide, many of which border <br />or intersect routes leading to local parks. These high-volume, high-speed corridors <br />present barriers to safe access. While Vision Zero focuses broadly on traffic safety, it <br />does not specifically address routes to parks. The proposed Plan will fill this gap by <br />identifying targeted improvements to make walking, biking, and wheelchair travel to <br />parks safer and more accessible for all residents. <br />The City of Santa Ana Public Works Agency Traffic Engineering Division intends to <br />advertise a Request for Proposals (RFP) in December 2025 to solicit qualified <br />consultant firms who specialize in providing transportation planning and traffic <br />engineering professional services related to safe routes to parks and ADA accessibility. <br />U.S. DOT requires that an RFP be released after the agreement is fully executed. <br />Once completed, the Safe Routes to Parks and Wheelchair Assessment Plan and its <br />recommended improvements will be leveraged to seek additional grant funding to <br />construct the recommended improvements.