Laserfiche WebLink
M 0 1 M I <br /> Date:June 26, 2025 Project:Centennial Regional Park, Fields 5 and 6 <br /> Santa Ana,CA <br /> To: Hawk Scott Musco Project Dumber:223727 <br /> Sourcewell <br /> Master Project: 199030,Contract Number:041123-MSL, Expiration:06/16/2027 <br /> Category:Sports lighting with related supplies and services <br /> All purchase orders should note the following: <br /> Sourcewell Purchase—Contract Number:041123-MSL <br /> Quotation Price—Materials Delivered to lob Site and Installation <br /> Musco Materials: $ 599,000.00 <br /> Estimated Taxes(9.25%): $ 55,407.00 <br /> Electrical Engineering: $ 22,167.00 <br /> Geotechnical Engineering: $ 38,267.00 <br /> Installation: $ 420,920.00 <br /> Project Total: $1,135,761.00 <br /> Optional Adders- <br /> Payment/Performance Bond: $ 7,974.00 <br /> Wire Guardian: $45,713.00 <br /> Pricing and lead times are effective for 90 days. Prices are subject to change if the order is not released within 60 days from <br /> the date of the purchase. <br /> Light-Structure System'with Total Light Control—TLC for LED'"'technology <br /> Guaranteed Lighting Performance <br /> • Guaranteed light levels per Musco design#22372.7A: <br /> ■ 50 FC(2:1)infield/30 FC(2.5:1)Outfield on the(2)ballfields(60'basepath,225'Radius outfields) <br /> ■ 30 FC(2.5:1)on the approximate 540'x 530'open space/soccer area <br /> System Description <br /> • (86) Factory aimed and assembled luminaries <br /> ■ (66) For the field lighting <br /> ■ (20)for Area Lighting <br /> • (10)Galvanized steel poles <br /> • (10)Pre-cast concrete bases with integrated lightning grounding <br /> • Pole length factory assembled wire harnesses <br /> • Factory wired and tested remote electrical component enclosures <br /> • (10)Auxiliary mounting brackets with 2 position crossarm with tenon attachment for TLC-LED-550 area lights <br /> • UL listed assemblies <br /> • Enhanced corrosion protection <br /> Environmental Light Control <br /> • Spill light minimized at 1S0'perimeter around the skate park to 0.005 maximum horizontal footcandles,0.04 <br /> maximum vertical footcandles <br /> • Off-site glare light minimized at 150'perimeter around the skate park to 1000 candela <br /> Control Systems and Services <br /> • Control-Link®control and monitoring system to provide remote on/off and dimming(high/medium/low)control <br /> and performance monitoring with 24/7 customer support <br /> ■ Includes(1)24"x 72"Control and Monitoring Cabinet with(11)30A contactors and(6)OOA switches <br /> 2016.2023 Musco Sports Lighting.LLC-M-2168-enUS-14 <br /> 016 <br /> 6CC3, <br /> t of 6 <br />