My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SAGECREST PLANNING AND ENVIRONMENTAL (2)
Clerk
>
Contracts / Agreements
>
S
>
SAGECREST PLANNING AND ENVIRONMENTAL (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 1:54:46 PM
Creation date
1/8/2026 1:44:34 PM
Metadata
Fields
Template:
Contracts
Company Name
SAGECREST PLANNING AND ENVIRONMENTAL
Contract #
A-2023-194-32A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ano <br /> 0 <br /> SAGECREST <br /> PLANNING+ENVIRONMENTAL <br /> Task 2.1 - Peer Review of Air Quality, Greenhouse Gas, and <br /> Energy Technical Studies <br /> The following scope of work is proposed for the peer review of the air quality, <br /> greenhouse gas, and energy study: <br /> l. Obtain and review the latest copy of the Air/GHG/Energy technical study, <br /> analysis calculation worksheets, and relevant sections from the CEQA document, <br /> as applicable. <br /> 2. Review the applicable air quality and greenhouse gas standards and thresholds 3'- <br /> of significance that apply to the project vicinity. <br /> 3. Review the CalEEMod emissions output files to ensure that project emissions were <br /> adequately analyzed and identify any changes to default inputs that may <br /> require further explanation or support. <br /> 4. Review the daily criteria air pollutant emissions calculations and ensure the study <br /> properly identifies all applicable construction and operational air quality impacts <br /> associated with the project. <br /> 5. Review the annual GHG emissions calculations and ensure the study properly <br /> identifies all applicable GHG impacts associated with the project. <br /> 6. Review any proposed mitigation measures and project design features and <br /> ensure the study has adequately applied the appropriate emissions reductions. <br /> 7. Review the energy calculations and impact analysis discussion as it pertains to <br /> CEQA Guidelines, Appendix F, Energy Conservation requirements. <br /> 8. Provide up to three (3) rounds of peer review. The first peer review will address <br /> the initial technical study. The subsequent peer reviews will ensure that the first <br /> review comments are adequately addressed, if needed. <br /> All comments will be summarized in a formal memorandum. <br /> Task 2.2 - Peer Review of Noise Technical Study <br /> The following scope of work is proposed for the peer review of the noise study: <br /> 1. Obtain and review the technical noise study and relevant sections from the <br /> CEQA document. <br /> 2. Review the applicable noise and vibration standards and regulations that would <br /> apply to the project, including City of Santa Ana General Plan and Municipal <br /> Code requirements. <br /> 3. Confirm that the analysis adequately identifies the location(s) of any noise <br /> sensitive receptors in the project area. <br /> 4. Review the methodology and findings for establishing the baseline noise <br /> environment. <br /> City of Santa Ana-CEQA Peer Review Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.