|
Line i'[ernl
<br />Discount Terms No Discount
<br />Item #
<br />Item Cede Type
<br />Item Description
<br />UOM
<br />QTY
<br />Unit Price
<br />Line Total
<br />Response Comment
<br />TOTAL BASE BID (Items 1,13)
<br />5674,103.40
<br />1
<br />1
<br />Remove Underground Storage Tanks
<br />LS
<br />1
<br />533,06A00
<br />$33.084.00
<br />Yes
<br />2
<br />2
<br />Remove Above Ground Fuel Storage Tank/Dispenser System
<br />LS
<br />1
<br />53.444.00
<br />53,444.00
<br />Yes
<br />3
<br />3
<br />Remove Existing Metal Enclosure
<br />LS
<br />1
<br />53,316A0
<br />53,316.00
<br />Yes
<br />4
<br />4
<br />Concrete ulssons/structural footing Foundations
<br />LS
<br />1
<br />537,049.22
<br />537,049.22
<br />Yes
<br />i
<br />S
<br />Install Above Ground Fuel Storage Tank/Dispenser System
<br />LS
<br />1
<br />5121.261.22
<br />5123,287.22
<br />yes
<br />6
<br />6
<br />I nstall Portable DEF Storage Tank
<br />1.5
<br />1
<br />525,147,76
<br />$25,14T.76
<br />yes
<br />7
<br />7
<br />Install metal bollards
<br />LS
<br />1
<br />510,907.22
<br />S10,907.22
<br />Yes
<br />e
<br />a
<br />Instill Metal Structure/Canopy with metal decking and metal roofing
<br />LS
<br />1
<br />$I 32.26322
<br />ST32,263.22
<br />Yes
<br />9
<br />9
<br />Fire extinguishers
<br />LS
<br />1
<br />5420.00
<br />5420.00
<br />Yes
<br />10
<br />10
<br />Product pipes, vapor pipes and fittings and accessories, pipe support
<br />1.6
<br />1
<br />511.76322
<br />S1 1,763.22
<br />Yes
<br />11
<br />11
<br />Transition sumps 6Vapor pot
<br />LS
<br />1
<br />572,600.00
<br />S12,600.00
<br />Yes
<br />12
<br />12
<br />Vaedar•Root TLS 300C
<br />LS
<br />1
<br />$40,84122
<br />$40,841.22
<br />Yes
<br />13
<br />13
<br />Unleaded. Diesel fuel dispenser, those
<br />LS
<br />1
<br />$42,6%22
<br />$42,696.22
<br />Yes
<br />14
<br />14
<br />Dispensing pump control panel
<br />1.5
<br />1
<br />55,943.00
<br />SS,943.00
<br />Yes
<br />15
<br />15
<br />Fuel turbines
<br />LS
<br />1
<br />$16,8%22
<br />$16,896.22
<br />Yes
<br />16
<br />16
<br />Electric duct bank for signal and power, puil boxes, able tray, exterior electrical panel
<br />LS
<br />1
<br />$29,27322
<br />$29,273.22
<br />Yes
<br />1T
<br />17
<br />Power, control and communication conduits, cables, seats and support
<br />LS
<br />1
<br />$17.141.22
<br />$17.14122
<br />Yes
<br />18
<br />18
<br />Concrete pavement mmovel/instattatlon
<br />Sf
<br />1100
<br />S9040
<br />$55,880.00
<br />Yes
<br />19
<br />19
<br />fencing and Barricades
<br />LS
<br />1
<br />517,36T22
<br />517,367.22
<br />Yes
<br />20
<br />20
<br />Disposal of construction materials
<br />LS
<br />1
<br />$21,55T22
<br />S21,S57.22
<br />Yes
<br />21
<br />21
<br />Sheeting, sharing, bracing and excavation protection
<br />LS
<br />1
<br />513,224.00
<br />S13,224.00
<br />Yes
<br />22
<br />22
<br />As -Built Plans
<br />LS
<br />1
<br />55,000.00
<br />$5.000.00
<br />Yes
<br />23
<br />23
<br />Construction Permit
<br />LS
<br />1
<br />$10.000.00
<br />S10,000.00
<br />Yes
<br />24
<br />24
<br />OC4CA Fees
<br />LS
<br />1
<br />55,000.00
<br />55,000.00
<br />Yes
<br />City Council 22 — 41 1/20/2026
<br />
|