Laserfiche WebLink
Exhibit A-2 <br />Project Information <br />Control System <br />Control System ID: <br />Control System Type: <br />Communication Type: <br />1 of 1 <br />Control -Link .®,.,Control and Monitoring <br />��► System <br />•`$owerLlne-ST <br />Power Requirements <br />Control cabinet(s): <br />Control voltage.(pha;e to neu\,a" <br />VA loading - Inrush <br />VA loading -Sealed <br />Lighting Circuits: <br />Voltage/Hertz/Pha> <br />Important Notes: <br />Project Name: Centennial Park Playground I Project N: 245379 <br />Control System ID:1 of 1 <br />Distribution Panel Location/ID: Service 1 <br />Project Notes: <br />Equipment Listing <br />Description Qty Size (in) <br />1308.0 Control and monitoring cabinet - 1 24 X 48 <br />154.0 primary <br />Contactors, 30 amperes <br />480/60/3 Off/On/Auto switches <br />1. Please confirm that the lighting circuit voltage listed above is accurate for this facility. This is the voltage/phase being <br />connected and utilized at each lighting pole's electrical components enclosure disconnect. Inaccurate voltage/phase can <br />result in additional costs and delays. Contact your Musco sales representative to confirm this item. <br />2. In a 3 phase design, all 3 phases are to be run to each pole location. Musco's single phase luminaires come pre -wired to utilize <br />all 3 phases across the entire facility. <br />3. One contactor is required for each circuit at each pole location. Contactors are 3 pole and 100% rated for the published <br />continuous load. <br />4. If the lighting system will be fed from more than one distribution location, additional equipment may be required. Contact <br />your Musco sales representative. <br />5. Size overcurrent devices using the full load amps column of the Circuit Summary by Switch chart (Minimum power factor is <br />0.9). Size conduit per code unless otherwise specified as larger to allow for harness connectors. <br />6. Avoid use of in -ground junction/pull boxes when possible. If used, the following best practices must be followed: <br />• Underground handholes (pull boxes) must be supported to prevent settling. Boxes buried directly in soil, without support, <br />are not allowed. <br />• Use polymer concrete lids marked with ELECTRIC for underground handholes. Steel lids are not allowed. <br />• Avoid underground connections when possible. If used, all wire connectors must be UL listed for Wet Locations to prevent <br />leakage current. <br />7. Control power wiring must be in separate conduit from line or load power wiring. Communication cables must be in separate <br />conduit from any power wiring. <br />8. Test wire per ANSI/NETA ATS-2021. Wires with insulation resistance less than 100 MOhms, in water -filled conduit, must be <br />replaced. <br />9. Refer to Installation Instructions for more details on equipment information and the installation requirements. <br />Sales Representative: Mike Marchetti I Project Engineer; Daniel Lohman I Scan: 245379A <br />www.musco.com I lighting@musco.com <br />