My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FLOOD CONTROL DISTRICT - 1959
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FLOOD CONTROL DISTRICT - 1959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 12:03:05 PM
Creation date
1/21/2026 12:03:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FLOOD CONTROL DISTRICT
Contract #
A-59
Agency
Public Works
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 contract. <br /> 2 City desires that the location of ssid culvert be changed aa <br /> 3 that the downstream end of said culvert will coincide with the <br /> 4 southerly right of way line of Sagerstrom Avenue and that the up- <br /> 5 stream reinforced concrete transition be deleted and the savings <br /> 6 realised be used to construct additioaal length to said culvert. City <br /> 7 intends to increase the length of said culvert and construct an upetiL <br /> 8 transition structure to protect the entire culvert at Name later dat, , <br /> 9 It has been determined and agreed that the swifts realised <br /> 10 by the deletion of said upstream transition would be equal or neerF: <br /> 11 aqual to the cost of providing IS additional feet of culvert aaa <br /> 12 limitable cut-off wall at the upstream end of the culvert invert. <br /> 13 The best interests of the parties hereto will be served by <br /> 14 9istrict constructing said culvert in accordance with the desire of <br /> 15 Aty„ and by City assuming maintenance responsibilities of said <br /> 18 culvert and chancel made necessary by the deletion of said transitiL, <br /> 17 NOV* THEREFORE, in consideration of the mutua/ benefits, <br /> 18 covenants, and conditions herein contained, the parties hereto egx, <br /> 19 Ir. <br /> 20 141, District shall CMOS the following changes to be mode to <br /> 21 said contract awarded November 13, 1958. <br /> 22 a. Said culvert shall be relocated and increased in <br /> 23 length so that the outside face of the duwa4ti.cluta <br /> 24 headwall shall be at Station 381+41.40 An4 the norr <br /> 25 end of the upstream end of culvert SiliaLi at. <br /> 26 Station 361+98.07. <br /> 27 b. The upstream reinforced concrete transition snail <br /> 28 be deleted. <br /> 29 8 A three-foot deep reinforced concrete cut-off well <br /> 30 shall be constructed across the chaiuk:i <br /> 31 upstream end of said culvert. <br /> 32 <br /> .2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.