My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OC FAIR & EVENT CENTER (2)
Clerk
>
Contracts / Agreements
>
O
>
OC FAIR & EVENT CENTER (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 2:12:57 PM
Creation date
2/3/2026 2:12:38 PM
Metadata
Fields
Template:
Contracts
Company Name
OC FAIR & EVENT CENTER
Contract #
N-2026-020
Agency
Police
Expiration Date
12/31/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction documents: Construction documents shall be prepared by a California registered <br /> design professional(structural engineer) in accordance with the California Building Code and ANSI <br /> E1.21 where applicable. Documents shall include: <br /> 1.A summary sheet showing the building code used, design criteria, loads and support reactions. <br /> 2. Detailed construction and installation drawings. <br /> 3. Design calculations. <br /> 4. Operating limits of the structure explicitly outlined by the registered design professional <br /> including environmental conditions and physical forces. <br /> S. Effects of additive elements such as video walls,supported scenery, audio equipment,vertical <br /> and horizontal coverings. <br /> 6. Means for adequate stability including specific requirements for guying and cross-bracing, <br /> ground anchors or ballast for different ground conditions. <br /> Designation of responsible party: The owner of the temporary special event structure shall <br /> designate in writing a person to have responsibility for the temporary special event structure on <br /> the site. The designated person shall have sufficient knowledge of the construction documents, <br /> manufacturer's recommendations and operations plan to make judgments regarding the <br /> structure's safety and to coordinate with the fire code official. <br /> Operations plan: The operations plan shall reflect manufacturer's operational guidelines, <br /> procedures for environmental monitoring and actions to be taken under specified conditions <br /> consistent with the construction documents. <br /> Means of egress—The means of egress for temporary special event structures shall comply with <br /> California Fire Code. <br /> For official code standards, refer to the California Fire Code (CFC) section applicable to <br /> Temporary Special Event Structures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.