Laserfiche WebLink
City of Santa Ana <br />Bristol Street and Memory Lane Intersection Improvements (Project #17-6883), bidding on 10/17/2025 2:00 PM (PDT) <br />Page 3 of 5 <br />Printed 12/22/2025 <br />Item # Item Code <br />Type Item Description <br />UOM <br />QTY <br />Unit Price <br />Line Total <br />Response Comment <br />Bid Items <br />$1,889,790.00 <br />1 <br />Clearing and Grubbing <br />LS <br />1 <br />$48,000.00 <br />$48,000.00 <br />Yes <br />2 <br />Unclassified Excavation- <br />CY <br />Soo <br />$500.00 <br />$250,000.00 <br />Yes <br />3 <br />Cold Mill (3")• <br />SF <br />22800 <br />$2.00 <br />$45,600.00 <br />Yes <br />4 <br />AC Pavement* <br />TN <br />610 <br />$172.00 <br />$104,920.00 <br />Yes <br />5 <br />Asphalt Rubber Hot Mix (ARHM)' <br />TN <br />400 <br />$165.00 <br />$66,000.00 <br />Yes <br />6 <br />Crushed Miscellaneous Base (CMB)` <br />CY <br />100 <br />$98.00 <br />$9,800.00 <br />Yes <br />7 <br />PCC Sidewalk (T=4") <br />SF <br />2700 <br />$20.00 <br />$54,000.00 <br />Yes <br />8 <br />PCC Driveway Approach (T=8") <br />SF <br />600 <br />$42.00 <br />$25,200.00 <br />Yes <br />9 <br />PCC Curb Ramp (T=4") <br />SF <br />400 <br />$53.00 <br />$21,200.00 <br />Yes <br />10 <br />PCC Brick Red Colored with Topcast Exposed Aggregate (T=4") <br />SF <br />Soo <br />$40.00 <br />$20,000.00 <br />Yes <br />11 <br />PCC Bus Pad (Include Dowels) <br />SF <br />200 <br />$44.00 <br />$8,800.00 <br />Yes <br />12 <br />PCC Curb and Gutter (Type A-2.8) <br />LF <br />400 <br />$114.00 <br />$45,600.00 <br />Yes <br />13 <br />PCC Curb (Type B-1) <br />LF <br />440 <br />$67.00 <br />$29,480.00 <br />Yes <br />14 <br />PCC Curb(SPPWC Type AI-6) <br />LF <br />30 <br />$68.00 <br />$2,040.00 <br />Yes <br />15 <br />PCC Retaining Curb- <br />LF <br />40 <br />$150.00 <br />$6,000.00 <br />Yes <br />16 <br />Furnish and Install Landscape (with Irrigation) <br />LS <br />1 <br />$34,000.00 <br />$34,000.00 <br />Yes <br />17 <br />60 Working Days Landscape and Irrigation Maintenance <br />LS <br />1 <br />$7,500.00 <br />$7,500.00 <br />Yes <br />18 <br />Local Depression (C.S.A STD 305) <br />EA <br />1 <br />$4,000.00 <br />$4,000.00 <br />Yes <br />19 <br />Furnish and Install Modular Wetland System (MWS-L-4.4-V-UG) or Approved Equal <br />LS <br />1 <br />$68,000.00 <br />$68,000.00 <br />Yes <br />20 <br />Parkway Culvert (Modified C.S.A STD 318) <br />EA <br />1 <br />$16,000.00 <br />$16,000.00 <br />Yes <br />21 <br />8" SDR 26 PVC Pipe with Catch Basin Tie -In <br />LF <br />20 <br />$300.00 <br />$6,000.00 <br />Yes <br />22 <br />Additional Potholing (As Needed)- <br />EA <br />5 <br />$1,500.00 <br />$7,500.00 <br />Yes <br />23 <br />Remove Block Wall & Reconstruct End <br />LS <br />1 <br />$14,000.00 <br />$14,000.00 <br />Yes <br />24 <br />Remove Block Wall with Wrought Iron Fence & Reconstruct End <br />LS <br />1 <br />$19,000.00 <br />$19,000.00 <br />Yes <br />25 <br />Retaining Wall <br />LF <br />60 <br />$1,700.00 <br />$102,000.00 <br />Yes <br />26 <br />Wrought Iron Fence <br />LF <br />45 <br />$500.00 <br />$22,500.00 <br />Yes <br />27 <br />Remove Chain Link Fence <br />LF <br />175 <br />$24.00 <br />$4,200.00 <br />Yes <br />28 <br />Furnish and Install Chain Link Fence <br />LF <br />165 <br />$120.00 <br />$19,800.00 <br />Yes <br />29 <br />Traffic Signal Modification <br />LS <br />1 <br />$298,000.00 <br />$298,000.00 <br />Yes <br />30 <br />Install Video Detection System <br />EA <br />1 <br />$45,000.00 <br />$45,000.00 <br />Yes <br />31 <br />Install GTT Opticom EVP System <br />EA <br />1 <br />$14,000.00 <br />$14,000.00 <br />Yes <br />32 <br />Install 2" PVC Conduit <br />LF <br />450 <br />$31.00 <br />$13,950.00 <br />Yes <br />33 <br />Install 3" PVC Conduit <br />LF <br />Soo <br />$37.00 <br />$18,500.00 <br />Yes <br />34 <br />Install 4" PVC Conduit <br />LF <br />350 <br />$62.00 <br />$21,700.00 <br />Yes <br />35 <br />Install SCE Handhole <br />EA <br />1 <br />$2,400.00 <br />$2,400.00 <br />Yes <br />36 <br />Install No.5 Pull Box <br />EA <br />3 <br />$1,300.00 <br />$3,900.00 <br />Yes <br />37 <br />Install No.6 Pull Box <br />EA <br />4 <br />$1,500.00 <br />$6,000.00 <br />Yes <br />38 <br />Install No. 6E Pull Box <br />EA <br />3 <br />$3,000.00 <br />$9,000.00 <br />Yes <br />39 <br />Install IP Communication System <br />LS <br />1 <br />$14,000.00 <br />$14,000.00 <br />Yes <br />40 <br />Signing and Striping <br />LS <br />1 <br />$26,000.00 <br />$26,000.00 <br />Yes <br />41 <br />Install Street Light Pole <br />EA <br />1 <br />$12,000.00 <br />$12,000.00 <br />Yes <br />42 <br />Remove & Salvage Street Light Pole <br />EA <br />1 <br />$1,700.00 <br />$1,700.00 <br />Yes <br />43 <br />Pothole Pole Locations for Utility Conflicts <br />EA <br />3 <br />$1,500.00 <br />$4,500.00 <br />Yes <br />44 <br />Temporary Overhead Wiring <br />LS <br />1 <br />$9,000.00 <br />$9,000.00 <br />Yes <br />45 <br />Adjust Manhole Frame and Cover to Finished Grade <br />EA <br />1 <br />$4,000.00 <br />$4,000.00 <br />Yes <br />46 <br />2" Copper Water Service <br />EA <br />1 <br />$49,000.00 <br />$49,000.00 <br />Yes <br />47 <br />4" Water Service <br />EA <br />1 <br />$98,000.00 <br />$98,000.00 <br />Yes <br />48 <br />6" Fire Service <br />EA <br />1 <br />$76,000.00 <br />$76,000.00 <br />Yes <br />49 <br />Fire Hydrant <br />EA <br />1 <br />$59,000.00 <br />$59,000.00 <br />Yes <br />