|
City of Santa Ana
<br />Bristol Street and Memory Lane Intersection Improvements (Project #17-6883), bidding on 10/17/2025 2:00 PM (PDT)
<br />Page 3 of 5
<br />Printed 12/22/2025
<br />Item # Item Code
<br />Type Item Description
<br />UOM
<br />QTY
<br />Unit Price
<br />Line Total
<br />Response Comment
<br />Bid Items
<br />$1,889,790.00
<br />1
<br />Clearing and Grubbing
<br />LS
<br />1
<br />$48,000.00
<br />$48,000.00
<br />Yes
<br />2
<br />Unclassified Excavation-
<br />CY
<br />Soo
<br />$500.00
<br />$250,000.00
<br />Yes
<br />3
<br />Cold Mill (3")•
<br />SF
<br />22800
<br />$2.00
<br />$45,600.00
<br />Yes
<br />4
<br />AC Pavement*
<br />TN
<br />610
<br />$172.00
<br />$104,920.00
<br />Yes
<br />5
<br />Asphalt Rubber Hot Mix (ARHM)'
<br />TN
<br />400
<br />$165.00
<br />$66,000.00
<br />Yes
<br />6
<br />Crushed Miscellaneous Base (CMB)`
<br />CY
<br />100
<br />$98.00
<br />$9,800.00
<br />Yes
<br />7
<br />PCC Sidewalk (T=4")
<br />SF
<br />2700
<br />$20.00
<br />$54,000.00
<br />Yes
<br />8
<br />PCC Driveway Approach (T=8")
<br />SF
<br />600
<br />$42.00
<br />$25,200.00
<br />Yes
<br />9
<br />PCC Curb Ramp (T=4")
<br />SF
<br />400
<br />$53.00
<br />$21,200.00
<br />Yes
<br />10
<br />PCC Brick Red Colored with Topcast Exposed Aggregate (T=4")
<br />SF
<br />Soo
<br />$40.00
<br />$20,000.00
<br />Yes
<br />11
<br />PCC Bus Pad (Include Dowels)
<br />SF
<br />200
<br />$44.00
<br />$8,800.00
<br />Yes
<br />12
<br />PCC Curb and Gutter (Type A-2.8)
<br />LF
<br />400
<br />$114.00
<br />$45,600.00
<br />Yes
<br />13
<br />PCC Curb (Type B-1)
<br />LF
<br />440
<br />$67.00
<br />$29,480.00
<br />Yes
<br />14
<br />PCC Curb(SPPWC Type AI-6)
<br />LF
<br />30
<br />$68.00
<br />$2,040.00
<br />Yes
<br />15
<br />PCC Retaining Curb-
<br />LF
<br />40
<br />$150.00
<br />$6,000.00
<br />Yes
<br />16
<br />Furnish and Install Landscape (with Irrigation)
<br />LS
<br />1
<br />$34,000.00
<br />$34,000.00
<br />Yes
<br />17
<br />60 Working Days Landscape and Irrigation Maintenance
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.00
<br />Yes
<br />18
<br />Local Depression (C.S.A STD 305)
<br />EA
<br />1
<br />$4,000.00
<br />$4,000.00
<br />Yes
<br />19
<br />Furnish and Install Modular Wetland System (MWS-L-4.4-V-UG) or Approved Equal
<br />LS
<br />1
<br />$68,000.00
<br />$68,000.00
<br />Yes
<br />20
<br />Parkway Culvert (Modified C.S.A STD 318)
<br />EA
<br />1
<br />$16,000.00
<br />$16,000.00
<br />Yes
<br />21
<br />8" SDR 26 PVC Pipe with Catch Basin Tie -In
<br />LF
<br />20
<br />$300.00
<br />$6,000.00
<br />Yes
<br />22
<br />Additional Potholing (As Needed)-
<br />EA
<br />5
<br />$1,500.00
<br />$7,500.00
<br />Yes
<br />23
<br />Remove Block Wall & Reconstruct End
<br />LS
<br />1
<br />$14,000.00
<br />$14,000.00
<br />Yes
<br />24
<br />Remove Block Wall with Wrought Iron Fence & Reconstruct End
<br />LS
<br />1
<br />$19,000.00
<br />$19,000.00
<br />Yes
<br />25
<br />Retaining Wall
<br />LF
<br />60
<br />$1,700.00
<br />$102,000.00
<br />Yes
<br />26
<br />Wrought Iron Fence
<br />LF
<br />45
<br />$500.00
<br />$22,500.00
<br />Yes
<br />27
<br />Remove Chain Link Fence
<br />LF
<br />175
<br />$24.00
<br />$4,200.00
<br />Yes
<br />28
<br />Furnish and Install Chain Link Fence
<br />LF
<br />165
<br />$120.00
<br />$19,800.00
<br />Yes
<br />29
<br />Traffic Signal Modification
<br />LS
<br />1
<br />$298,000.00
<br />$298,000.00
<br />Yes
<br />30
<br />Install Video Detection System
<br />EA
<br />1
<br />$45,000.00
<br />$45,000.00
<br />Yes
<br />31
<br />Install GTT Opticom EVP System
<br />EA
<br />1
<br />$14,000.00
<br />$14,000.00
<br />Yes
<br />32
<br />Install 2" PVC Conduit
<br />LF
<br />450
<br />$31.00
<br />$13,950.00
<br />Yes
<br />33
<br />Install 3" PVC Conduit
<br />LF
<br />Soo
<br />$37.00
<br />$18,500.00
<br />Yes
<br />34
<br />Install 4" PVC Conduit
<br />LF
<br />350
<br />$62.00
<br />$21,700.00
<br />Yes
<br />35
<br />Install SCE Handhole
<br />EA
<br />1
<br />$2,400.00
<br />$2,400.00
<br />Yes
<br />36
<br />Install No.5 Pull Box
<br />EA
<br />3
<br />$1,300.00
<br />$3,900.00
<br />Yes
<br />37
<br />Install No.6 Pull Box
<br />EA
<br />4
<br />$1,500.00
<br />$6,000.00
<br />Yes
<br />38
<br />Install No. 6E Pull Box
<br />EA
<br />3
<br />$3,000.00
<br />$9,000.00
<br />Yes
<br />39
<br />Install IP Communication System
<br />LS
<br />1
<br />$14,000.00
<br />$14,000.00
<br />Yes
<br />40
<br />Signing and Striping
<br />LS
<br />1
<br />$26,000.00
<br />$26,000.00
<br />Yes
<br />41
<br />Install Street Light Pole
<br />EA
<br />1
<br />$12,000.00
<br />$12,000.00
<br />Yes
<br />42
<br />Remove & Salvage Street Light Pole
<br />EA
<br />1
<br />$1,700.00
<br />$1,700.00
<br />Yes
<br />43
<br />Pothole Pole Locations for Utility Conflicts
<br />EA
<br />3
<br />$1,500.00
<br />$4,500.00
<br />Yes
<br />44
<br />Temporary Overhead Wiring
<br />LS
<br />1
<br />$9,000.00
<br />$9,000.00
<br />Yes
<br />45
<br />Adjust Manhole Frame and Cover to Finished Grade
<br />EA
<br />1
<br />$4,000.00
<br />$4,000.00
<br />Yes
<br />46
<br />2" Copper Water Service
<br />EA
<br />1
<br />$49,000.00
<br />$49,000.00
<br />Yes
<br />47
<br />4" Water Service
<br />EA
<br />1
<br />$98,000.00
<br />$98,000.00
<br />Yes
<br />48
<br />6" Fire Service
<br />EA
<br />1
<br />$76,000.00
<br />$76,000.00
<br />Yes
<br />49
<br />Fire Hydrant
<br />EA
<br />1
<br />$59,000.00
<br />$59,000.00
<br />Yes
<br />
|