Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-E883 <br />■ East: Memory Lane continues east of the Project site. Commercial uses (Floral Park Promenade located to <br />the east and northeast and a Shell gasoline service station located to the east and southeast) are present. <br />These properties are al designated GC and zoned C1. Further southeast of Shell, single-family residential <br />uses (designated LR-7 and zoned Single -Family Residence [R1]) are present. <br />Sonth: Bristol Street continues south of the Project site. Commercial uses (the Shell gasoline service <br />station located to the south and southeast and a strip -mall with neighborhood serving retail uses located to <br />the south and southwest) are present. All of these properties are designated GC and zoned C1. Further <br />southeast of Shell, Casa de Santiago single-family residential uses (designated LR-7 and zoned R1) are <br />present <br />■ Mest: Memory Lane continues west of the Project site. Vacant land (designated GC and zoned Cl) is <br />situated to the west of the Project site and further west is the Portofino Apartments (designated Ll 7 and <br />zoned Specific Development [SD27]). Islander Apartments (designated LR-7 and zoned C1) are situated to <br />the west and northwest of the Project site. <br />As shown on Exhibit 3, Existing land Uses (199O-EISIEIM, these land uses have not substantially changed since <br />preparation of the 1990 FEISIEIR. It is acknowledged that the 1990 FEISIEIR did not include land uses north of <br />Memory Lane in the applicable figures. In order to provide information on land uses north of Memory Lane, <br />Exhibit 3 als❑ identifies these current land uses. These current land uses have not substantially changed since the <br />1990 FEISIEIR, as the 1990 FEISIEIR considered the surrounding land uses to include a mix of commercial and <br />residential development. <br />1.3 PROJECT BACKGROUND <br />1.3.1 APPROVED 1990 FINAL EIR/E15 <br />The City of Santa Ana General Plan designates Bristol Street as a Major Arterial Highway traveling in a north -south <br />direction. As a result of signifi.cant growth and traffic congestion on Bristol Street, the City of Santa Ana, in the late <br />1980s, proposed to widen Bristol Street from a four -lane roadway to a six -lane arterial in accordance with adopted <br />County of Orange and City of Santa Ana standards for a Major Arterial Highway. A joint EIS/EIR was prepared <br />and approved by the City of Santa Ana and the California Department of Transportation (Caltrans) for the widening <br />of Bristol Street in 1990. The 1990 Bristol Street Widening Project entailed a 3.9-mile segment of Bristol Street <br />from Warner Avenue to Memory Lane. The Project site is situated within the northern -most portion of Bristol <br />Street, previously analyzed in the 1990 FEISIEIR as the segment from Seventeenth Street to Memory Lane. <br />However, due to significant costs associated with construction and availability of funding, the Bristol Street <br />Widening Project was divided into multiple segments and phases, compared to that analyzed in the 1990 FEIS/EIR: <br />■ Phase I, from McFadden Avenue to Pine Street; <br />■ Phase II, from 316 Streetto Civic Center; <br />■ Phase IIIA, from Civic Center to Washington Avenue; <br />■ Phase IIIB, from Washington Avenue to 17a' Street; and <br />■ Phase IV, from Warner Avenue to St Andrew Place. <br />The Bristol Street Widening segments operate independently; operation of one segment is not dependent on another. <br />It is acknowledged that prior to dividing the Bristol Street Widening Project for funding purposes, construction of <br />some sections was completed and was not included in the phasing described above, including the following: <br />• St Andrew PIace to McFadden Avenue; <br />• Elm Street to Memory Lane, and <br />■ Pine Street to 31d Street. <br />The segment between 17a' Street and Elm Street is not funded;. therefore, no phasing has been identified. <br />Final I December 2017 1-6 Introduction <br />