My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:34:13 AM
Creation date
2/11/2026 7:52:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />According to the 2015 Orange County Congestion Alaaagement Program, prepared by the Orange County <br />Transportation Authority, dated November 2015, the intersection of Bristol Street and Memory Lane is not a CMP <br />intersection, nor is this intersection located along a CMP Highway System. Further, as discussed in Response <br />3,16(a), the proposed Project would result in an improvement to both the AM and PM Peak Hour LOS. As the <br />proposed Project would not increase the capacity of the roadway network, the Project would not result in greater <br />impacts than that previously analyzed in the 1990 FEIVEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />c) Result in a change in air trgrw patterns, including either an increase in triew- levels or a change in <br />loeo on that results in substantial safety risks? <br />The closest airport to the site is John Wayne — Orange County Airport, located approximately 5.9 miles southeast of <br />the Project site; the proposed Projeet would have no impact on air traffic patterns. The proposed Project would not <br />introduce any new risks or increase risks. Impacts would not be.greater than that previously analyzed in the 1990 <br />FE[SIE[R. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISMIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />14 Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous <br />intersections) or incompalihle uses (e.g., farm. equipmeo ? <br />The proposed Project would improve the traffic flow at the Bristol Street and Memory Lane intersection and would <br />not create any sharp curves or other incompatible uses. Impacts would not be greater than that previously analyzed <br />in the 1990 FEIS/E[R. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISMIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Result in inadequate emergency access? <br />The proposed Project would improve traffic operations along Bristol Street in the long-term. During the <br />construction phase traffic flow along Bristol Street within the Project limits could be temporarily affected, including <br />the mobility of emergency vehicles; however, access, including two --way travel would be maintained through the <br />Project corridor during construction. Traffic control plans would be prepared prior to construction to facilitate <br />traffic movement through the Project corridor during construction Although the proposed Project may interfere <br />with emergency access in the short-term, it would improve emergency access once the Project is completed. <br />Implementation of 1990 FEISIEIR Mitigation Measures V-10, V-12, V-13 and V-16 would reduce impacts <br />associated with inadequate emergency access to a Iess than significant Ievel. Impacts would not be greater than that <br />previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: Referto.1990 FEISIEIR Mitigation Measures V-10, V=12, V-13, <br />and V-16. <br />Mitigation Measures: No additional mitigation measures are required. <br />f) Conflict WM adopted policies, plans, or programs regarding public transi4 bicycle, or pedestrian <br />facilities, or otherwise decrease the performance or safety of such facilities? <br />The proposed Project would not conflict with any altemative transportation plan and would increase safety <br />associated with improvements to the traffic operations through the Project area. The proposed Project would not <br />Final I December 2017 3-26 Environmental Consequences <br />
The URL can be used to link to this page
Your browser does not support the video tag.