My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:34:13 AM
Creation date
2/11/2026 7:52:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPO RTADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />MODIFIED INITIAL STUDY CHECKLIST <br />New Impacts of Proposed <br />Previous FEISIEIR <br />Project Changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After 1990 <br />Impact <br />Required? <br />Mitigation <br />e) For a project located within an airport <br />land use plan or, where such a plan has <br />not been adopted, within two miles of a <br />public airport or public use airport, would <br />X <br />YES <br />NO <br />the project result in a safety hazard for <br />people residing or working in the project <br />area? <br />f For a project within the vicinity of a <br />private airstrip, would the project result in a <br />X <br />YES <br />N0 <br />safety hazard for people residing or <br />working in the project area? <br />-- -- - - - - -- -- -- <br />g) Impair implementation of or physically <br />interfere with an adopted emergency <br />v <br />YES <br />NO <br />response plan or emergency evacuation <br />plan? <br />h) Expose people or structures to a <br />significant risk of loss, injury or death <br />involving wildland fires, including where <br />X <br />YES <br />N0 <br />wildlands are adjacent to urbanized areas <br />or where residences are intermixed with <br />wildlands? <br />9. HYDROLOGY AND WATER QUALITY <br />VVould the project: <br />a) Violate any water quality standards or <br />X <br />YES <br />NO <br />waste discharge requirements? <br />b) Substantially deplete groundwater <br />supplies or interfere substantially with <br />groundwater recharge such that there <br />would be a net deficit in aquifer volume or <br />a lowering of the local groundwater table <br />X <br />YES <br />NO <br />level (e.g., the production rate of pre- <br />existing nearby wells would drop to a level <br />that would not support existing land uses <br />or planned uses for which permits have <br />been granted)? <br />_..... ... .... <br />....... ......... <br />............... <br />--------- <br />.................. <br />c) Substantially alter the existing drainage <br />pattern of the site or area, including <br />through the alteration of the course of a <br />X <br />YES <br />N0 <br />stream or river, in a manner that would <br />result in substantial erosion or siltation on - <br />or off -site? <br />Final I December 2017 6 Appendix A - Modified Initial Study Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.