My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:13:33 AM
Creation date
2/11/2026 7:53:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />47 <br /> <br />West Side Design Concepts <br />Multi -Use Path Concept <br />This concept includes a multi-use path on the south side of First Street. This space is shared <br />by pedestrians and bicyclists and is approximately 14’ wide. This area would narrow to 10’ <br />near trees, light posts, utilities and bus stops. Distinct colors or textures on the pavement <br />could be used to help delineate areas for pedestrians and bicycles within this space; <br />however, there would be no physical separation between those who are walking or rolling <br />and those on a bicycle. On the north side of the street, a sidewalk would be provided for <br />pedestrians . As such, the bicyclists would be permitted only on the south side of the street. <br />Illustrations of this concept are provided in Figure 26. <br />This concept provides six travel lanes and left turn pockets at intersections, consistent with <br />existing conditions . To provide additional space on the south side of the street for the multi- <br />use trail, existing lane widths are narrowed to 11’ and the center median is narrowed to 12’. <br />Figure 26. Illustrations of the Multi-Use Path Concept <br /> <br />.
The URL can be used to link to this page
Your browser does not support the video tag.