My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:13:33 AM
Creation date
2/11/2026 7:53:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />64 <br /> <br /> <br />Next Steps <br />With the development of the three concepts, the next step in the project is to select a locally <br />preferred alternative. In order to select that option, the following steps will be completed: <br />• Complete the OCTAM model and assess the redistribution of traffic related to <br />potential lane reductions and update the levels of service. <br />• Conduct meetings with the Stakeholder Group and the Community Working Group to <br />receive additional feedback on the three Concepts. <br />• Present and receive direction from City Council. <br />Once a locally preferred alternative is selected, the project team will move forward with the <br />final engineering, feasibility study and environmental document for the corridor. Due to <br />project funding, this phase of the project will need to be completed by December 2026. The <br />City is currently seeking funding to finalize the engineering, prepare bid documents and <br />construct the project; however, additional funding may be needed for construction depending <br />upon the concept selected.
The URL can be used to link to this page
Your browser does not support the video tag.