Laserfiche WebLink
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />64 <br /> <br /> <br />Next Steps <br />With the development of the three concepts, the next step in the project is to select a locally <br />preferred alternative. In order to select that option, the following steps will be completed: <br />• Complete the OCTAM model and assess the redistribution of traffic related to <br />potential lane reductions and update the levels of service. <br />• Conduct meetings with the Stakeholder Group and the Community Working Group to <br />receive additional feedback on the three Concepts. <br />• Present and receive direction from City Council. <br />Once a locally preferred alternative is selected, the project team will move forward with the <br />final engineering, feasibility study and environmental document for the corridor. Due to <br />project funding, this phase of the project will need to be completed by December 2026. The <br />City is currently seeking funding to finalize the engineering, prepare bid documents and <br />construct the project; however, additional funding may be needed for construction depending <br />upon the concept selected.