My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:13:33 AM
Creation date
2/11/2026 7:53:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />2 <br /> <br />existing conditions of the First Street corridor. This information in conjunction with the <br />technical multimodal analysis and traffic modeling and community input resulted in the <br />development of three potential concepts that will improve the travel environment on First <br />Street. Ultimately, these three concepts will be reviewed by City Council, and a locally <br />preferred alternative will be selected. The City has funding to advance this alternative into <br />final design and is in the process of securing funding for construction. <br /> <br /> Figure 1. Project Corridor <br /> <br /> <br />Figure 2. Examples of Best Street Practices for Pedestrian Facilities <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.