My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />2.0 ENVIRONMENTAL CHECKLIST <br />2.1 BACKGROUND <br />1. Project Title: Bristol Street and Memory Lane Intersection Improvements Project (Project No. 17-6883) <br />2. Lead Agency Name and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />3. Contact Person and Phone Num ber: <br />Kenny Nguyen, P.E. <br />Senior Ciml Engineer <br />714.647.5632 <br />4. Project Location: The intersection of Bristol Street and Memory Lane in the City of Santa Ana. The Project site is <br />located approximately 0. 73 mile west of Interstate 5 (1-5) and approximately 0.25 mile south of State Route 22 (SR - <br />22). <br />5. Project Sponsor's Nam a and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />6. General Plan Designation: General Commercial (GC) and Low Density Residential (LR -7) <br />7. Zoning: Community Commercial (Cl) and Specific Development(SD27) <br />8. Description of the Project: The City proposes the widening of Bristol Street just north of Memory Lane, to <br />accommodate a third southbound through lane at the intersection. This additional through lane would result in the <br />relocation of the existing dedicated right -turn lane slightly west The proposed Widening would involve the partial <br />acquisition of three parcels in order to accommodate the new total ROW widths (proposed to expand from 100 feet <br />to 111 feet). The proposed intersection improvements would require relocation of curb/gutter, sidewalk, driveway <br />approaches, and both public and private utilities (including the existing traffic signal). Due to the existing building <br />setback requirements, the Project would require approval from the City Manager for landscape strip Exceptions for <br />building setbacks per Municipal Code Section 41- 781. The original approved 1990 FEIS/EIR proposed the same <br />intersection lanes Width and configuration as that proposed. The 1990 FEIS/EIR considered a 117 -foot ROW Width <br />in order to accommodate the additional third through lane, specifically for the southbound travel lane. However, no <br />specific take of adjoining properties was acknowledged although the existing ROW is only 100 feet. Thus, the <br />Project changes clarify that in order to accommodate a third -through lane and bike lane, the Project requires to <br />widen the existing street ROW width of 100 feet to 111 feet, with the street section Width from 84 feet to 95 feet, and <br />the partial acquisition of three properties. <br />9. Surrounding Land Uses and Setting: Surrounding land uses consist of commercial and multi- and single-family <br />residential uses; referto Section 1.2, Protect Location. <br />10. <br />agreement). <br />City of Santa Ana <br />Final I December 2017 2-1 Environmental Checklist <br /> <br /> <br />City Council 14 – 47 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.