My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />Certified 1990 FRIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Result in substantial soil erosion or the loss of topsoil? <br />Exposure of barren rock and soil surfaces during coustmction would result in soil erosion. However, considering <br />the slight gradient, the anticipated erosion impact would be nominal. The proposed Project would not result in <br />greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FRIS/EIR Mitigation Measures: <br />C-2 Straw or other suitable materials will be placed over uncovered soils, as needed, during street <br />construction activities. This would reduce the amount of erosion. <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Be located on a geologic unit or soil that is unstable, or that would become unstable us a result of <br />the project and potentially result in on- or off-site IandvHde, lateral sprealmg, subsidence, <br />Hguefactum or collapse? <br />The 1990 FEIS/EIR indicated t hatthere are no instances of undisturbed, natural soils. TheProject site located in an <br />area identified as having high to medium subsidence for liquefaction. However, the Project area is fully developed <br />with urban uses within the City of Santa Ana and the proposed Project would be constructed in accordance with the <br />standards of the Uniform Building Code (UBC). Implementation of 1990 FEIS/EIR mitigation measure B-2, to <br />replace surface level structures with stmcMres that have extensive subsurface footings that reach stable material <br />would reduce any structural impacts from ground failure to less than significant. The proposed Project would not <br />create greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FRIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure B-2. <br />Mitigation Measures: No additional mitigation measures are required. <br />d) Be located on expansive soil as defused in Table ]8-]-B of the Unafbrm Building Code (1994), <br />creafing substantial risks to bye or properly? <br />The proposed Project would not include construction of any habitable stmcmres nor would the Project increase the <br />number of persons at the Project site Thus, the proposed Project would not create substantial risks to life or <br />property and the proposed Project would not create greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FRIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure B-2. <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Have saZv incapable of adequately supporting the use of septic tanks or alternative waste wader <br />disposal systems where sewers are rat avatablefor the disposal ofwaste seater? <br />The proposed Project would not generate any sewage or wastewater and would not require installation of any septic <br />tanks or altemative wastewater systems. No impacts are anticipated in this regard and the proposed Project would <br />not create greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FRIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />Final I December 2017 3-11 Environmental Consequences <br /> <br /> <br />City Council 14 – 59 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.