My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />3.9 HYDROLOGY AND WATER QUALITY <br />This section corresponds with the following 1990 FEIS/EIR, Section IV, Environmental Consequences and <br />Afiifigadon Measures, subsections: <br />Subsection C, Erosion Impacts, <br />Subsection D,Floodplain/Floodway Ewroochnent, and <br />Subsection F, Water Qrality. <br />Would the project: <br />a) Violate any water quality standards or waste discharge requirementr? <br />Under Section 402 of the Clean Water Act (CWA), the EPA has established regulations under the NPDES program <br />to control direct storm water discharges. Should 1.0 acre or more of site disturbance occur, those activities would be <br />subject to the NPDES program for the Santa Ana Regional Water Quality Control Board. The proposed Project <br />would only impact approximately 0. 39 acres, which is less than the 1.0 -acre threshold. Thus, the Project would not <br />be subject to NPDES requirements, as potential waste discharge would be nominal. Furthermore, the Project would <br />be required to comply with the 1990 FEIS/EIR Mitigation Measure C-2, involving the placement of straw or other <br />suitable materials over uncovered soils, as needed, during street coustruction activities, further reducing the amount <br />of erosion occurring at the Project site Regarding operations, the Project would not increase the capacity of the <br />roadway or the number of vehicles using the Project area. Therefore, impacts to water quality would be similar to <br />those identified in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure C-2. <br />Mitigation Measures: No additional mitigation measures are required. <br />Al Substantially deplete groundwater supplies or interfere substantially with groundwater recharge <br />such but there would be anet deficit in aquifer volume or a lowering of the local groundwater table <br />level (e.g., the production rate of pre-existing nearby wells would drop to a level that would not <br />support ezisfing Ianduces or plannedusesfor whiehpermits have beengranten)? <br />The proposed Project would not result in increased water consumption and would not deplete groundwater supplies. <br />No impact to groundwater supplies would result from the proposed Project Impacts in this regard would not be <br />greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Substantially after the ezisfing drainage pattern of the site or area including through the afteradon <br />of the course of a sueam or river, in a mmmer that would result in substantial erosion or siltation <br />on- or off-site ? <br />The proposed Project would only nominally increase the paved/impervious areas of the Project site. This nominal <br />increase would not result in a substantial increase in erosion or siltation on- or off-site. Further, implementation of <br />1990 FEIS/EIR Mitigation Measure C-2 would reduce any potential erosion/siltation impacts during construction. <br />Thus, impacts in this regard would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure C-2 <br />Mitigation Measures: No additional mitigation measures are required. <br />Final I December 2017 3- 17 Environmental Consequences <br /> <br /> <br />City Council 14 – 65 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.