My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />C) A substantial permanent increase is ambient noise levels is the project vicinity above levels existing <br />without the project? <br />Refer to Responses 3.12(a) and 3.12(6). Impacts would not be greater than that previously analyzed in the 1990 <br />FFIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No new additional mitigation measures are required. <br />14 A substantial tempormy or periodic increase in ambient noise levels in the project vicinity above <br />Levels existing without the project? <br />Refer to Response 3. 12(a), for discussion regarding temporary noise impacts associated with Project coustmction. <br />Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measures I-1 through I-6. <br />Mitigation Measures: No new additional mitigation measures are required. <br />e) For a project located within as airport laud use plan or, where such a plan has not been adopted <br />within two miles of apubtc airport or public use airport wouldthe project expose people residing or <br />mmking in the project areata excessive noise levels? <br />The Project site is not located within an airport land use plan. The nearest airport is the John Wayne — Orange <br />County Airport, located approximately 5.9 miles from the proposed Project No impacts would occur. Impacts <br />would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No new additional mitigation measures are required. <br />For a project within the vicinity of a private airstrip, wuhdd the project ¢spas¢ people residing or <br />worlung in the project areata excessive noise levels? <br />Refer to Response 3.12(e). The proposed Project is not located within the vicinity of a private airstrip. Impacts <br />would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No new additional mitigation measures are required. <br />3.13 POPULATION AND HOUSING <br />This section corresponds with the following 1990 FEIS/EIR, Section IV, Environmental Consequences and <br />Mfigadon Medssures, subsections: <br />Subsection L, Population; <br />Subsection M, Housing Displacement; <br />Subsection N, Business Displacement, <br />Subsection 0, Impacts on Neighborhood Churacwr andMmority Groups; and <br />Subsection R, Effict on Assessed Property Values. <br />Final I December 2017 3-22 Environmental Consequences <br /> <br /> <br />City Council 14 – 70 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.