My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Police Protection? <br />Refer to Response 3. 14(a)(i). The proposed Project would not result in the need or increase the demand for police <br />services in the area. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Schools? <br />The proposed Project does not involve any new development and no new population would result Therefore, no <br />schools or school services would be impacted by the proposed Project Impacts would not be greater than that <br />previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No new additional mitigation measures are required. <br />d) Parks? <br />The proposed Project does not involve any new development and no new population would result There are no <br />parks within the Project limits, and no needs for additional park services would occur as a result of the proposed <br />Project Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Otherpublicfactddes? <br />The proposed Project does not involve any new development and no new population would result Therefore, the <br />Project would not generate demands for other public facilities. Impacts would not be greater than that previously <br />analyzed in the 1990 FEIS/EIR <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />3.15 RECREATION <br />This section coresponds with the 1990 FEIS/EIR, Section IV, Environmental Consequences and Mitigation <br />Akasures, Subsection P, Impact on Recreational Facilifies. <br />a) Would the project increase the use of existing neighborhood and regional parks or other <br />recreational factides such that substantial physical deterioration of the fwddy would occur or be <br />accelerated? <br />The proposed Project involves the widening of Bristol Street, just north of Memory Lane, to accommodate a third <br />southbound through lane within a highly urbanized and built -out area in the City. The widening of Bristol Street <br />would not induce growth, nor create demand for recreation -related services. Furthermore, the proposed Project <br />Final I December 2017 3-24 Environmental Consequences <br /> <br /> <br />City Council 14 – 72 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.