Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />MODIFIED INITIAL STUDY CHECKLIST <br />Final I December 2017 4 Appendix A -Mod ified Initial Study Checklist <br />New Impacts ofProposed Premous FEISIEIR <br />Project Changes <br />No Less Than Less Than Potentially Impacts Subsequent or <br />Impact Significant Significant Significant Disclosed? Supplemental EIR <br />Impact After 1990 Impact Required? <br />Mitigabon <br />f) Conflict with the provisions of an adopted <br />Habitat Conservation Plan, Natural <br />Community Conservation Plan, or other X YES NO <br />approved local, regional, or state habitat <br />conservation plan? <br />5. CULTURAL RESOURCES. Would the <br />project: <br />a) Cause a substantial adverse change in <br />the significance of a historical resource as X YES NO <br />defined in § 15064.5? <br />b) Cause a substantial adverse change in <br />the significance of an archaeological X YES NO <br />resource pursuant to § 15064.5? <br />c) Directly or indirectly destroy a unique <br />paleontological resource or site or unique X YES NO <br />geologic feature? <br />d) Disturb any human remains, including <br />those interred outside of formal X YES NO <br />cemeteries? <br />6. GEOLOGY AND SOILS. Would the <br />project: <br />a) Expose people or structures to potential <br />substantial adverse effects, including the <br />risk of loss, injury, or death involving: <br />i) Rupture of a known earthquake fault, as <br />delineated on the most recent Alquist- <br />Priolo Earthquake Fault Zoning Map <br />issued by the State Geologist for the area X YES NO <br />or based on other substantial evidence of a <br />known fault? Refer to Division of Mines <br />and Geology Special Publication 42. <br />ii) Strong seismic ground shaking? X YES NO <br />iii) Seismic -related ground failure, including X YES NO <br />liquefaction? <br />iv) Landslides? X YES NO <br />b) Result in substantial soil erosion or the X YES NO <br />loss Oftopsoil? <br />Final I December 2017 4 Appendix A -Mod ified Initial Study Checklist <br />  <br />  <br />City Council 14 – 86 2/17/2026