My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Item 17 - First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Presentation - Item 17 - First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 8:50:15 PM
Creation date
2/17/2026 8:49:56 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
19
Date
2/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[First Street Multimodal][Public Works, Traffic][February 17, 2026]Slide 13 <br />Project Background <br />•Funded through REAP 2.0 grant administered by OCTA and SCAG <br />•Grant focuses on improving access for low-income housing through improved multimodal options within existing right-of -way <br />•Scope includes existing conditions assessment, community engagement, alternatives analysis, feasibility studies, and 100% design of the Locally Preferred Alternative <br />•December 2026 grant deadline, condensed schedule <br />•HDR Inc., a global traffic engineering and transportation planning firm, was awarded contract in May 2025
The URL can be used to link to this page
Your browser does not support the video tag.